Belfast

PAC Solar

PAC Solar provides commercial & residential solar panel systems, battery storage & energy optimization in the UK, emphasizing performance & value.
★★★★★  
👥
Reviews
🏆Elite+ Installer

About

PAC Solar is a UK-based renewable energy company specializing in the design, supply, and installation of solar PV systems, battery storage, and EV charging solutions. With a strong reputation for professionalism, quality workmanship, and customer-focused service, the company supports both homeowners and businesses in transitioning to clean, sustainable energy.

The mission of PAC Solar is to deliver affordable and efficient renewable energy systems that help clients save on energy costs, reduce carbon emissions, and gain long-term energy independence. Their vision is to accelerate the UK’s adoption of solar technologies by providing practical, tailored solutions that meet modern energy demands.

From consultation and bespoke system design to installation and ongoing maintenance, PAC Solar offers end-to-end services backed by a team of skilled engineers. Known for its transparency and reliability, the company ensures that every project is completed to the highest standards of safety, efficiency, and performance.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar system maintenance and repairs

✔️ Energy efficiency consultation

✔️ Financing and renewable support options

Products & Manufacturers

PAC Solar works with trusted global manufacturers to ensure reliable and high-performance systems:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Unit 37 Somerton Industrial Park Dargan Crescent Belfast,BT3 9JB
44 28 9336 4600
info@pacgroup.co.uk

Service Areas

Belfast

Certifications

PAC Solar operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer rights and fair practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

PAC Solar provides warranty coverage in line with UK solar industry best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in solar and renewable energy installations

Projects Completed

Dozens of residential and commercial projects successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with PAC Solar Solar Solutions

Frequently Asked Questions

Do they install domestic and commercial solar?

Yes — they install domestic, commercial and agricultural solar systems.

Do they offer a free, no-obligation quote?

Yes — they provide free site analysis, design and estimates.

Do they provide system design & yield calculations?

Yes — they include system design and performance calculations in their process.

Get a Free Solar Quote

Interested in PAC Solar? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.