London

OneEnergy

OneEnergy is a UK engineering group specializing in commercial fit-outs, facility management, and renewable energy services with a focus on sustainability and energy efficiency.
★★★★★  
5
👥
5
Reviews
🏆Elite+ Installer

About

OneEnergy is a UK-based renewable energy company dedicated to providing high-quality solar PV systems, battery storage, and sustainable energy solutions for households, businesses, and communities. With a strong focus on sustainability and customer care, OneEnergy works to make clean, affordable energy accessible to everyone.

The company’s mission is to help clients transition toward energy independence while reducing energy costs and carbon footprints. Their vision is to support the UK’s net zero ambitions by delivering innovative solar and storage systems that combine advanced technology with reliable performance.

Known for their professional approach and transparent service, OneEnergy offers end-to-end solutions—from consultation and design to installation and maintenance. With customer satisfaction at the core of their operations, OneEnergy ensures that each system is tailored to meet the unique needs of clients while achieving maximum efficiency and long-term value.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar systems

✔️ Battery storage integration

✔️ EV charging station installation

✔️ Solar maintenance and servicing

✔️ Energy efficiency consultation and audits

✔️ Financing and renewable support options

Products & Manufacturers

OneEnergy partners with trusted global manufacturers to ensure system reliability and efficiency:

  • Solar Panels: JA Solar, Trina Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Office 1, Izabella House, OneEnergy, 24-26 Regent Pl, Birmingham B1 3NJ, United Kingdom
441299848514
sales@oneenergy.org.uk

Service Areas

London

Certifications

OneEnergy operates in line with recognized UK renewable industry standards:

  • MCS (Microgeneration Certification Scheme) – ensuring certified installations.
  • NICEIC – electrical safety compliance.
  • RECC (Renewable Energy Consumer Code) – consumer rights and ethical practices.
  • ISO 9001/14001 – quality and environmental management standards.

Warranty Information

OneEnergy provides warranty coverage aligned with industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Customer Reviews

Read what our customers have to say about their experience with OneEnergy Solar Solutions

Absolute pleasure these lads were! Polite, friendly, down to earth, yet very professional! Did a bang on job of installing my new car charging port. They were clean & tidy, nice & neat. Went through the app with me, explained everything in layman's terms 👌 would highly recommend. 10/10 5 stars from me

Samantha “Sam” Parker

Lads were brilliant, good service all round. Went above and beyond, very tidy and clean.

Chris Garfield

Very professional, quick tidy install with zero mess

Ian Lloyd

Frequently Asked Questions

What areas does GreenLight serve?

GreenLight operates across the UK, offering renewable energy and sustainability consultancy, including solar solutions.

Does GreenLight help with government incentives or grants?

Yes, they advise clients on available grants, subsidies, and incentive programs to maximize savings.

How eco-friendly are GreenLight’s solar solutions?

Their solutions are designed to increase energy efficiency and significantly cut carbon emissions.

Get a Free Solar Quote

Interested in OneEnergy? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.