Liverpool

Northern Solar Ltd

Northern Solar Ltd designs and installs solar PV, battery storage & EV charging solutions across Northern England, combining local expertise and sustainability.
★★★★★  
5
👥
10
Reviews
🏆Elite+ Installer

About

Northern Solar Ltd is a renewable energy company based in the UK, specializing in solar PV installations, battery storage, and energy efficiency solutions for both residential and commercial clients. With a reputation for professionalism and high-quality service, the company is committed to helping customers cut energy bills, reduce carbon footprints, and achieve energy independence.

The mission of Northern Solar Ltd is to make renewable energy simple, affordable, and future-proof. By combining technical expertise with customer-focused service, the company delivers tailored energy systems that maximize efficiency and reliability. Their vision is to play a key role in advancing the UK’s net zero goals by supporting households, businesses, and communities in adopting clean energy technologies.

With a skilled team of engineers and renewable specialists, Northern Solar Ltd provides end-to-end services, from consultation and system design to installation, testing, and aftercare. Known for its transparency and dedication to customer satisfaction, the company continues to grow as a trusted name in the UK renewable sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar system maintenance and aftercare

✔️ Energy efficiency consultation

✔️ Financing and renewable support options

Products & Manufacturers

Northern Solar Ltd partners with trusted renewable brands to ensure system efficiency and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Northern Solar Ltd, ABC Offices, 58 Breckfield Rd S, Liverpool L6 5DR, United Kingdom
44 151 259 8503
admin@northernsolar.co.uk

Service Areas

Liverpool

Certifications

Northern Solar Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – electrical safety compliance.
  • RECC (Renewable Energy Consumer Code) – ensuring consumer protection.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Northern Solar Ltd provides warranties consistent with UK solar industry practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in renewable energy installations

Projects Completed

Dozens of residential and commercial projects successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with Northern Solar Ltd Solar Solutions

Great company. Carried out the job as promised, arrived on time and got the job done. Removed panels that had been fitted incorrectly by a bunch of cowboys, worked with the roofing company to get the proper fixings in place and fitted the system in line with industry standards. Great job from a reliable and honest company.

Chris

I had previously used Northern Solar to sit our solar system some years back, the system had been working faultlessly until the other day.I contacted Northern Solar and they came out the very next day to find that squirrels had nested under the panels and chewed through the wire.I received a quote for the repairs soon after their visit, and the work was carried out in very quick time with no fuss at all.Great service and professional throughout.

Marcus Fluegge

Northern Solar installed my solar PV in June 2022. From start to finish they have been nothing but professional. A clear precise quote with no hidden extras, excellent communication throughout the entire process. A really neat install. Professional installation team turned up on time were neat and tidy and left my property as they found it. Office based team always responded to emails and phone calls. Highly recommend for PV install.

Tony Mcclave

Frequently Asked Questions

How long has Northern Solar been in business?

Founded in 2006 — they were one of the early solar PV providers in Merseyside and the North West.

What services and capabilities does Northern Solar provide?

They handle solar panel installation, maintenance, repairs, and also offer battery storage systems.

Is Northern Solar certified / approved?

Yes — they are MCS approved and display industry-standard accreditations.

Get a Free Solar Quote

Interested in Northern Solar Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.