Manchester

Nightingale Electrical

Nightingale Electrical, founded in 1984, delivers full electrical & energy services, blending technical expertise with dependable solutions across sectors.
★★★★★  
5
👥
36
Reviews
🏆Elite+ Installer

About

Nightingale Electrical is a UK-based renewable energy and electrical services provider specializing in solar PV installations, battery storage, and EV charging solutions. With a strong foundation in electrical expertise, the company has built a reputation for delivering safe, efficient, and reliable renewable energy systems tailored to both residential and commercial clients.

The mission of Nightingale Electrical is to provide sustainable, high-quality energy solutions that empower households and businesses to reduce energy bills, increase self-sufficiency, and contribute to the UK’s net zero future. Their vision is to combine innovation with engineering excellence to make renewable energy accessible, affordable, and dependable.

By offering end-to-end services—from consultation and bespoke design through to installation and aftercare—Nightingale Electrical ensures every project is delivered to the highest industry standards. Known for professionalism, transparency, and excellent customer service, the company continues to grow as a trusted name in the UK renewable energy market.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Full electrical contracting services

✔️ Solar servicing and maintenance

✔️ Energy audits and consultation

Products & Manufacturers

Nightingale Electrical partners with leading renewable energy brands to ensure efficiency and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

St Andrews Place, Hill Ln, Blackrod, Bolton BL6 5JW, United Kingdom
44 1204 208050
info@nightelect.com

Service Areas

Manchester

Certifications

Nightingale Electrical operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with UK electrical safety regulations.
  • RECC (Renewable Energy Consumer Code) – ensuring consumer protection and fair practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Nightingale Electrical provides warranty coverage consistent with industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on product.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in electrical and renewable energy services

Projects Completed

Dozens of residential and commercial projects successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Nightingale Electrical Solar Solutions

We had a domestic install from Nightingale, Craig and team and we are very very happy. From day one where Craig did the initial visit, through numerous questions from me, reworking and tweaking what I wanted, and then through to a truly flawless install from the team, highly highly recommend them to anyone thinking about solar.

Ben Farnworth

I recently had solar panels installed on my house by this company, I couldn’t be more satisfied with the experience! From start to finish, their team was professional, knowledgeable, and genuine. Craig took the time to explain the entire process, from assessing my home’s solar potential to customising a system that perfectly fits my energy needs.

Afton Greatrex

Nightingale was recommended by a neighbour, and then after a small tender process, we chose to go with them. They beat the competition in terms of design, price and responsiveness.

S K

Frequently Asked Questions

How long has Nightingale Energy been in business?

Nightingale Energy (a division of Nightingale Electrical) has been operating since 2011 in the North West of the UK.

What warranties does Nightingale provide on solar installations?

Their warranty periods vary by service: from 2 years up to 10 years depending on which components or services are provided.

Does Nightingale offer maintenance and after-sales service?

Yes — they provide maintenance, servicing, inverter replacement, pest control, and support services post-installation.

Get a Free Solar Quote

Interested in Nightingale Electrical? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.