
Nextgen Bristol is a renewable energy company based in the South West, specializing in solar PV installations, battery storage, and sustainable energy solutions for residential and commercial clients. With a commitment to innovation, customer care, and quality workmanship, the company designs and installs tailored renewable systems that reduce energy bills, improve energy independence, and contribute to a greener future.
The mission of Nextgen Bristol is to make renewable energy practical and affordable for households and businesses, supporting the UK’s transition toward net zero. Their vision is to empower communities to embrace clean technologies that provide long-term environmental and financial benefits.
Known for professionalism, transparency, and technical expertise, Nextgen Bristol offers end-to-end services from consultation and system design to installation and ongoing maintenance. With a skilled team of renewable energy specialists, the company has earned a reputation for reliability, efficiency, and customer satisfaction across the region.
Nextgen Bristol partners with trusted renewable energy brands to ensure long-term performance and reliability:



Nextgen Bristol operates with or in line with the following certifications:
Nextgen Bristol provides warranties aligned with UK solar industry best practices:
English
Several years of renewable energy experience in the UK
Dozens of residential and commercial projects successfully delivered across the South West
Great from beginning to end.Installed Panels, Inverter and Battery - had no issues, team popped back the day after to finish some snags with no problems at all. Really pleased with the system.
NextGen have just completed a solar and battery installation for me and I’m delighted with it. Fabulous, no nonsense service from start to finish. I can’t recommend them highly enough.
not dealt with this company but encountered one of their vehicles on the A487 today. Pulled out on us on a 60mph road and had to slam my breaks on to avoid a colision. Then was weaving in the road crossing the central reservation on a number of occasions . The van then proceeded to overtake into on coming trafic and had to swerve back in to avoid a head on collision. The Registration of the vehicle was BJ22NPE. I hope the company reads this and advises the driver to be more careful in future as he could have caused a serious accident.
They state they are “solar panel experts in Bristol with over 10 year’s industry experience.”
They offer long warranties and manufacturer-backed guarantees; for example, their solar panels have a 25-year guarantee.
They offer solar panels (e.g. JA Solar), inverters from Solis, GrowWatt, Solax, GivEnergy, and provide EV charging and home battery systems.