London

New Dawn Solar

New Dawn Solar specializes in solar panel installations with tailored renewable energy solutions for residential and commercial properties across the UK.
★★★★★  
5
👥
26
Reviews
🏆Elite+ Installer

About

New Dawn Solar is a UK-based renewable energy company committed to delivering high-quality solar PV systems and sustainable energy solutions for homeowners, businesses, and organizations. Rooted in a philosophy of innovation and environmental responsibility, New Dawn Solar seeks to empower customers to make the switch to solar power, reduce energy bills, and contribute to carbon reduction efforts.

Their mission is to make solar energy accessible and reliable, providing service from initial consultation through to installation, monitoring, and maintenance. Leveraging a team of experienced engineers and solar specialists, New Dawn Solar ensures that every system is designed for optimum performance, safety, and durability. Known for transparent pricing, excellent product quality, and attentive customer service, the company has built a reputation for trustworthiness and effectiveness.

As the UK fast-tracks its net zero commitments, New Dawn Solar plays a vital role by providing solutions that are both sustainable and cost-efficient. Their vision encompasses driving growth in solar energy adoption while ensuring that clients benefit long term, with energy independence, reliable technology, and a strong commitment to environmental stewardship.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging point installation

✔️ Solar system maintenance and repairs

✔️ Energy consultation and performance audits

✔️ Financing and incentive guidance

Products & Manufacturers

New Dawn Solar partners with reliable and well-known manufacturers in the UK solar market, including:

  • Solar Panels: Trina Solar, Q CELLS, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

17 The Quadrant, Rickmansworth WD3 1GL, United Kingdom
443330907391
enquiries@newdawnsolar.co.uk

Service Areas

London

Certifications

New Dawn Solar operates in line with recognized industry credentials likely including:

  • MCS (Microgeneration Certification Scheme) – for ensuring certified installations and product quality.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – for consumer protection and ethical trading.
  • ISO 9001 / ISO 14001 – quality management and environmental management systems (if applicable).

Warranty Information

New Dawn Solar offers warranties consistent with established UK solar industry norms:

  • Solar panels – 20-25 years performance warranty.
  • Inverters – 5-12 years manufacturer’s warranty.
  • Workmanship / installation – 5-10 years.
  • Battery storage systems – 5-10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years operating in solar energy in the UK

Projects Completed

Dozens of residential and commercial installations successfully delivered

Customer Reviews

Read what our customers have to say about their experience with New Dawn Solar Solar Solutions

I can’t believe my luck in finding Daniel Rosser of New Dawn Solar who arranged a 16-panel solar installation to our property. Daniel took a very personal and thorough involvement, taking all my wishes into consideration. The workmen he employed to carry out this installation and his office staff are first class and attentive, nothing was too much trouble. I am delighted with my New Dawn Solar installation and it has been preforming extremely well. I would highly recommend this company.

Richard Bowles

We wanted to give the solar panels a few months of use before leaving a review—and they’ve exceeded our expectations. The whole process was efficient from start to finish. Scaffolders, roofers, installers, and the electrician were all supplied, and the entire project was completed in just 3 days.

Jo Lannon

Daniel and team were absolutely great. First class service and installation. They also were the lowest out of three quotes and moreover Daniel's system design offered the most energy and coat savings. Sitting here on a grey winter day I'm yet reap the full benefits of the solar pans however I’m very happy to know that all of my house's energy requirements are now bought overnight at a third of the cost and stored in the batteries for day ahead!

Piers Pertwee

Frequently Asked Questions

How long has Green Power Installations been in business?

With years of experience, Green Power Installations has become a trusted provider of solar panels and renewable energy solutions.

What types of solar panels does Green Power Installations use?

They install high-quality, efficient solar PV systems from leading manufacturers.

Does Green Power Installations also offer battery storage or EV charging?

Yes, they provide complete energy solutions, including solar batteries and EV charging stations.

Get a Free Solar Quote

Interested in New Dawn Solar? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.