Tyneside

Net-Zero Renewables

Net-Zero Renewables designs, installs and maintains solar, heat pumps and energy efficiency systems to help homes and businesses transition off fossil fuels.
★★★★★  
5
👥
29
Reviews
🏆Elite+ Installer

About

Net-Zero Renewables is a UK-based renewable energy company dedicated to providing high-quality solar PV systems, battery storage, and sustainable energy solutions for both residential and commercial clients. With a strong focus on helping the UK achieve its net zero targets, the company delivers tailored renewable solutions that lower energy bills, increase energy independence, and reduce carbon emissions.

The mission of Net-Zero Renewables is to make clean energy practical and accessible for households and businesses across the UK. By combining technical expertise with customer-focused service, the company ensures every installation delivers maximum efficiency and long-term performance. Their vision is to empower communities with future-ready renewable technologies that contribute to a sustainable and carbon-free future.

Net-Zero Renewables provides end-to-end services including consultation, bespoke design, professional installation, and reliable aftercare. With a growing portfolio of successful projects and a reputation for professionalism and quality workmanship, the company is recognized as a trusted partner in the renewable energy sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar servicing and maintenance

✔️ Energy efficiency consultation and audits

✔️ Financing and renewable support options

Products & Manufacturers

Net-Zero Renewables works with trusted renewable energy manufacturers to ensure high performance and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Unit 40, Apex Business Village, Annitsford, Cramlington NE23 7BF, United Kingdom
44 191 691 1027
info@net-zerorenewables.co.uk

Service Areas

Tyneside (Newcastle etc.)

Certifications

Net-Zero Renewables operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical standards.
  • RECC (Renewable Energy Consumer Code) – ensuring consumer protection.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Net-Zero Renewables provides warranties consistent with UK solar industry best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy expertise in the UK

Projects Completed

Dozens of residential and commercial solar projects successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Net-Zero Renewables Solar Solutions

The work I had done was 14 solo panels, loft insulation and heating throughout my 3 bedroom house. All the work was done just over a week and all the workmen were very polite and on time and they even hoovered and cleared up after themselves.Can’t thank them enough for what they’ve done

david black

The team provided an excellent service. Friendly, courteous and knowledgeable throughout.The y supplied three new high heat retention night storage heaters, three panel radiators, two fan heaters and three extractor fans along with 14 x Solar PV panels. This should lift the property from EPC Rating E to B and save the occupant a few £££s along the way.

CCTV Pearson

Joel and the team provided a better quote than all the other companies we had asked. The communication from start to finish was really efficient and the install was perfect. The system is providing even better outcomes than we anticipated and we are so happy we used net zero. They also provide brilliant after care to help you get the most out of your solar system - we have recommended to a few of our neighbours too!

Nikki T

Frequently Asked Questions

Does Net-Zero Renewables offer free quotes or consultations?

Yes — they provide a free, no-obligation quote / site survey for solar panel installs.

What areas does Net-Zero Renewables serve?

They operate in Newcastle and the North East and list local installation coverage.

What warranties or guarantees do they support?

Their site mentions “outstanding warranties” on equipment and installations.

Get a Free Solar Quote

Interested in Net-Zero Renewables? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.