Leicester

M E Solar Ltd

M E Solar installs solar PV systems and supports clients with energy optimization, maintenance and grid integration for homes & businesses.
★★★★★  
5
👥
4
Reviews
🏆Elite+ Installer

About

M E Solar Ltd is a UK-based renewable energy company specializing in solar PV installations, battery storage, and sustainable energy solutions for both residential and commercial clients. With a strong commitment to quality, innovation, and customer satisfaction, the company provides tailored systems that enable households and businesses to reduce energy costs, lower carbon emissions, and achieve energy independence.

The mission of M E Solar Ltd is to make renewable energy accessible, affordable, and practical, delivering end-to-end services from consultation and design to installation and long-term aftercare. Their vision is to support the UK’s transition to a low-carbon future by promoting sustainable technologies that deliver long-term benefits for clients and the environment.

With a skilled team of professionals and years of experience in the industry, M E Solar Ltd has built a reputation for reliable service, expert engineering, and a customer-first approach. Their combination of technical expertise and dedication to sustainability makes them a trusted partner for renewable energy solutions across the UK.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar servicing and maintenance

✔️ Energy audits and consultation

✔️ Flexible financing options

Products & Manufacturers

M E Solar Ltd works with trusted renewable energy manufacturers to deliver efficient and long-lasting systems:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

2nd Floor Chesnut House, North Street, Rugby, CV21 2AG;
44 800 772 3698
info@mesolar.co.uk

Service Areas

Leicester

Certifications

M E Solar Ltd operates with or in line with recognized UK renewable certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – ensuring fair trading and consumer protection.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

M E Solar Ltd provides warranties consistent with UK solar industry practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in renewable energy installations

Projects Completed

Dozens of residential and commercial projects successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with M E Solar Ltd Solar Solutions

I have just had a 6kWh solar system (14 panels), with 10kWh battery installed and commissioned by M E Solar. The installation was flawless. Scaffolding went up the day before the install date. Electrics were done first, due to it being a bit rainy. Day 2/3, solar panels went up and afternoon of Day 3 was commissioning. The team were friendly, efficient and clean. I was asked about various options for cable routing etc.

Simon Murphy

Robert did a brilliant job from start to finish. His initial home visit was incredibly thorough, where he detailed several options and helped me understand the best choice for my setup. He went over and above by providing additional research and guidance via email, ensuring I had all the information I needed.

Pav Manak

Great service from Robert.

Michael Hoskins

Frequently Asked Questions

What areas does M E Solar serve?

M E Solar operates in Warwickshire, Leicestershire & Northamptonshire.

What certifications does M E Solar have?

M E Solar is “MCS accredited” (stated on their site) for domestic & commercial solar installations.

Does M E Solar offer free quotes or surveys?

Yes — they advertise a no-obligation free survey / free quote on their website for solar & battery system evaluation.

Get a Free Solar Quote

Interested in M E Solar Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.