Leicester

Max Energy Ltd

Max Energy provides insulation, solar PV and energy efficiency services, helping homeowners & property developers lower energy costs through sustainable solutions.
★★★★★  
3
👥
19
Reviews
🏆Elite+ Installer

About

Max Energy Ltd is a UK-based renewable energy company dedicated to delivering high-quality solar PV systems, battery storage, and sustainable energy solutions for homes and businesses. With a strong commitment to affordability, innovation, and customer satisfaction, the company helps clients reduce energy costs, achieve energy independence, and contribute to the UK’s transition to a low-carbon future.

Max Energy Ltd’s mission is to provide practical and reliable clean energy solutions that are tailored to the unique needs of each customer. Their vision is to empower communities to embrace renewable technologies and create a greener, more sustainable environment for future generations.

By offering comprehensive services including consultation, bespoke system design, installation, and ongoing support, Max Energy Ltd ensures every project is completed with professionalism, transparency, and technical expertise. With years of experience and a skilled team of renewable specialists, the company has become a trusted partner for households and businesses across the UK.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar system servicing and maintenance

✔️ Energy efficiency consultation

✔️ Flexible financing and renewable support options

Products & Manufacturers

Max Energy Ltd works with globally recognized renewable energy brands to ensure quality and long-term reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

1 Boston Rd, Leicester LE4 1AA, United Kingdom
44 116 296 2700
info@maxenergy.direct

Service Areas

Leicester

Certifications

Max Energy Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – ensuring compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer rights and fair practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Max Energy Ltd offers warranty coverage aligned with UK solar industry best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in renewable energy and solar installations

Projects Completed

Dozens of residential and commercial solar projects completed across the UK

Customer Reviews

Read what our customers have to say about their experience with Max Energy Ltd Solar Solutions

One of their staff dumps their work vehicle on a private road, used by a farm. It explicitly is private with right of way for pedestrians and traffic accessing the private estate. Blocking access for the farm vehicles and HGV’s. They have a driveway down the road but refuses to use it and there’s a car park only round the corner.

francesca c

We had Wade from the Exmouth branch to install cavity wall insulation. He was fantastic and nothing was too much trouble for him. He couldn't get his van up our long narrow drive but was able to use hose extensions to reach. Matched our existing render really well as you can hardly see the drill holes. We found Wade very approachable, knowledgeable and hard working. Would highly recommend.

Sarah White

No experience of their workmanship but the standard of their employees driving is terrible. Just had one of their idiots use the left hand lane on a roundabout to turn right, in the process nearly hitting the front of my lorry, all in order to sneak in front of me. When i confronted him about it he just shrugged his shoulders and said he wasnt bothered. Very professional. This was in colchester on 22/7/24 at 1530

paul colclough

Frequently Asked Questions

What type of solar systems does Max Energy specialise in?

Max Energy specialises in in-roof solar PV systems (flush to roof) for new build homes, combining design and installation under one roof.

Are their products certified / guaranteed?

All products they install are MCS and BBA approved.

What areas does Max Energy cover?

They mention installations across England & Wales, via their regional branches.

Get a Free Solar Quote

Interested in Max Energy Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.