Birmingham

Maisum Renewable Energy

Maisum Renewable Energy delivers solar, biomass & sustainable heating systems with tailored design & end-to-end support across sectors.
★★★★★  
5
👥
35
Reviews
🏆Elite+ Installer

About

Maisum Renewable Energy is a UK-based renewable energy company providing advanced solar PV systems, battery storage, and EV charging solutions to residential, commercial, and industrial clients. With a strong focus on innovation, sustainability, and customer satisfaction, the company is dedicated to helping households and businesses reduce energy costs, achieve energy independence, and support the UK’s transition to a net zero future.

The mission of Maisum Renewable Energy is to make clean energy practical and accessible by combining cutting-edge technology with expert engineering. Their vision is to empower communities with future-ready renewable solutions that not only lower bills but also reduce reliance on fossil fuels.

Offering end-to-end services including consultation, system design, installation, and aftercare, Maisum Renewable Energy has built a reputation for reliability, professionalism, and technical expertise. With a skilled team and strong customer-first values, the company continues to grow as a trusted name in the UK renewable energy sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar energy systems

✔️ Industrial solar power solutions

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar panel servicing and maintenance

✔️ Energy efficiency consultation and audits

✔️ Flexible financing options

Products & Manufacturers

Maisum Renewable Energy partners with trusted global renewable energy manufacturers to ensure system efficiency and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Griffin Bridge House, Northfield Rd, Dudley DY2 9JA, United Kingdom
44 121 296 9512
info@maisum.co.uk

Service Areas

Birmingham

Certifications

Maisum Renewable Energy operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – ensuring compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – fair consumer protection practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Maisum Renewable Energy provides warranties aligned with UK solar industry standards:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of expertise in renewable energy installations

Projects Completed

Dozens of residential, commercial, and industrial projects delivered successfully

Customer Reviews

Read what our customers have to say about their experience with Maisum Renewable Energy Solar Solutions

Lee was recommended to me and I was so pleased with the service. I was awaiting a new EV car and he came promptly for a site visit, great communication and even details on funding from the Government for running a business. When the vehicle was on its way, Lee and his team came on time, ahead of schedule and sourced and installed the charger seamlessly. Even checking up shortly after to make sure everything worked well. I would highly recommend for ease of us, value for money and great service.

Holly Nixon

Maisum recently inspected my 16yr old Solar Array. Their thorough inspection also showed there was an issue with my RCBOs that were recently installed by another contractor. The Maisum engineer subsequently corrected the RCBO issue. Cannot thank you enough, you are very much experts within your field. Even better, the Maisum Drone also showed I have some issues with our roof tiles which can now be corrected too. Fantastic all round service.

Mark Colclough

Got in touch with Maisum renewables as my regular electrician was getting very unreliable. From my initial contact I felt confident that they would turn up and carry out the works required to get the heat pump installation up and running. The job that Ivan did was very tidy and thorough and I will be using Maisum renewables for all my electrical needs going forward.

Darren Russell plumbing &heating heating engineer

Frequently Asked Questions

What areas does Maisum Renewable Energy serve?

Maisum is based in the West Midlands and services clients across the West Midlands region, handling both domestic and commercial installs.

What certifications should Maisum Renewable Energy have?

Maisum is a member of the Renewable Energy Consumer Code (RECC) as listed in their membership directory.

Does Maisum Renewable Energy offer free quotes or consultations?

Yes — they offer a complimentary, no-obligation quote for solar panel installation. maisum.co.uk

Get a Free Solar Quote

Interested in Maisum Renewable Energy? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.