Sheffield

Mack Construction

Mack Construction expands into solar infrastructure, bringing its construction expertise to green energy projects with quality and precision.
★★★★★  
4
👥
25
Reviews
🏆Elite+ Installer

About

Mack Construction is a UK-based construction and renewable energy solutions provider, delivering a wide range of services including solar PV installations, energy-efficient building upgrades, and sustainable construction projects. With a strong background in construction and engineering, the company integrates renewable energy technologies seamlessly into residential, commercial, and industrial developments.

The mission of Mack Construction is to provide innovative and cost-effective solutions that combine structural expertise with modern sustainability practices. Their vision is to create homes and buildings that are not only safe and durable but also energy-efficient, environmentally friendly, and future-ready.

By offering end-to-end services—from initial consultation and design to construction, renewable installations, and ongoing maintenance—Mack Construction ensures each project meets the highest standards of safety, performance, and long-term reliability. The company’s reputation is built on professionalism, transparency, and a strong commitment to customer satisfaction, making it a trusted partner in both construction and renewable energy.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential and commercial solar PV installation

✔️ Battery storage solutions

✔️ EV charging infrastructure

✔️ New build construction and property development

✔️ Building renovations and retrofits

✔️ Sustainable construction solutions

✔️ Solar maintenance and aftercare

✔️ Energy efficiency audits and consultation

Products & Manufacturers

Mack Construction works with trusted global manufacturers for renewable energy solutions:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

55 Wollaton Rd, Bradway, Sheffield S17 4LF, United Kingdom
44 114 321 1788
mackcsltd@gmail.com

Service Areas

Sheffield

Certifications

Mack Construction operates with or in line with recognized UK industry certifications:

  • MCS (Microgeneration Certification Scheme) – for certified solar PV systems.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – fair trading and consumer protection.
  • Constructionline & CHAS – health, safety, and construction compliance.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Mack Construction provides warranty coverage aligned with UK construction and renewable energy standards:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.
  • Construction works – warranties tailored to specific projects.

Company Details

Languages Spoken

English

Years in Business

Several decades of experience in construction and renewable energy

Projects Completed

Hundreds of construction and renewable energy projects successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with Mack Construction Solar Solutions

MACK Solar fitted a 14 panel system to my house in 2018. The install only took a day and half and this included moving a soil vent pipe and boiler chimney. The chaps doing the install were friendly and professional

Paul Hughes

I used Mack for my solar PV. Rob was very professional and knowledgeable about the technicalities of my proposed installation. His quote was competitive. The workmen that fitted the installation had a high standard of workmanship. I have recommended Mach to friends and will continue to do so. The generation prediction is proving accurate.

Richard Carter

We are very pleased with our new solar panels. Mack Solar gave us a better quotation than another company we tried. We liked their relaxed and efficient approach, their construction experience, and the quality fixings for the panels to the roof. With 15 panels the generation capacity was higher than expected. On fitting day, all went well. The spreadsheet is useful bonus. So far the panels are making more power than estimated. We would confidently recommend Mack Solar.

Peter Latham

Frequently Asked Questions

What role does Mack Construction play in solar projects?

As a construction and building firm, they may handle structural work, roof mounting, or managing site works in solar installations.

Does Mack Construction subcontract installation or do in-house?

Likely a mix: they may subcontract specialist solar electrical work while handling civil/structural portions in-house.

What certifications should Mack Construction hold for solar work?

They should hold relevant industry certifications (e.g. MCS, electrical licensing) and building/roofing accreditations.

Get a Free Solar Quote

Interested in Mack Construction? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.