Glasgow

Lukas Solar Services Ltd

Lukas Solar Services Ltd handles all aspects of solar PV systems—installation, repair & maintenance—with a hands-on approach and local expertise.
★★★★★  
5
👥
58
Reviews
🏆Elite+ Installer

About

Lukas Solar Services Ltd is a UK-based renewable energy company specializing in solar PV installations, battery storage, and energy efficiency solutions for both residential and commercial clients. With a strong focus on customer satisfaction and sustainable living, the company delivers high-quality solar systems designed to lower electricity bills, increase energy independence, and reduce carbon emissions.

The mission of Lukas Solar Services Ltd is to make renewable energy simple, accessible, and cost-effective for households and businesses across the UK. Their vision is to empower communities with clean energy solutions that support the UK’s transition toward a greener, low-carbon future.

From consultation and system design to installation and aftercare, Lukas Solar Services Ltd offers complete end-to-end services. With a team of professional engineers and renewable specialists, the company ensures every project is installed to the highest standards of safety, reliability, and efficiency.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar energy systems

✔️ Battery storage solutions

✔️ EV charging point installations

✔️ Solar servicing and maintenance

✔️ Energy consultation and audits

✔️ Financing and renewable support

Products & Manufacturers

Lukas Solar Services Ltd works with globally recognized renewable brands to deliver reliable and efficient solutions:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

18 Brankston Ave, Stonehouse, Larkhall ML9 3JF, United Kingdom
44 7771 179305
info@lukassolar.co.uk

Service Areas

Glasgow

Certifications

Lukas Solar Services Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical safety regulations.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical trading.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Lukas Solar Services Ltd provides warranties in line with UK solar industry best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy expertise in the UK

Projects Completed

Dozens of residential and commercial solar installations delivered successfully

Customer Reviews

Read what our customers have to say about their experience with Lukas Solar Services Ltd Solar Solutions

A friend recommended Lukas to me for installing bird proof mesh, cleaning panels and servicing system, all of which he did in a professional manner.During this service he found a problem with the installation and he was extremely helpful, providing a report and photos, which made it easier for me to get original installers to fix problem.I can’t thank him enough.I will use his services again and would highly recommend him.

Christine McGhee

Lukas finished fitting a 5.6kW roof solar system with a 10.4kW battery system today for me. From start to finish the knowledge and experience Lukas had made the project an absolute breeze. Attention to detail second to none with all cable runs discretely installed and the solar panels aligned and symmetrical on the roof. The scaffold installation Lukas used was really good and all tied into the house as per industry regulations. No short cuts taken here. Really impressed and was great to see on a domestic installation.

Stephen Fraser

From our first communication with Lukas he was very polite and helpful.On arrival at our home he was friendly, courteous and very knowledgeable.If you are looking for a reliable person for solar panels etc etc etc, then Lukas is the person to call.We highly recommend his quality service.Alex & Julie, Ashgill.

Alexander Russell

Frequently Asked Questions

What areas does Lukas Solar Services serve?

I could not confirm their service area from public sources. You should check their website or contact them.

Is Lukas Solar Services a legitimate solar installer?

I could not find independent certification listings publicly; contacting them for proof of accreditations (e.g. MCS) is advisable.

How long will it take for their solar panels to pay for themselves?

Payback periods generally range from 5 to 10 years depending on electricity use, solar generation, incentives — you can ask Lukas for a personalized estimate.

Get a Free Solar Quote

Interested in Lukas Solar Services Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.