Hull

L-N Electrical Services Ltd

L-N Electrical Services offers full electrical, solar PV and power system installations with quality workmanship and trusted local service.
★★★★★  
5
👥
38
Reviews
🏆Elite+ Installer

About

L-N Electrical Services Ltd is a UK-based electrical contracting and renewable energy company specializing in solar PV installations, battery storage, and energy efficiency solutions. With a strong foundation in professional electrical services, the company has expanded its expertise into the renewable energy sector, helping households and businesses embrace clean, sustainable technologies.

The mission of L-N Electrical Services Ltd is to provide safe, reliable, and cost-effective energy systems that deliver long-term value. Their vision is to support the UK’s transition to a low-carbon economy by combining electrical engineering expertise with renewable energy innovation.

With years of experience in the industry, the company delivers tailored solutions backed by technical precision and excellent customer service. From consultation and system design to installation and aftercare, L-N Electrical Services Ltd ensures that every project meets the highest standards of safety, performance, and efficiency.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Full electrical contracting services

✔️ Solar maintenance and servicing

✔️ Energy efficiency consultation

Products & Manufacturers

L-N Electrical Services Ltd works with trusted renewable and electrical brands to ensure system performance and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Unit 46, Louie Pearlman Centre, 94 Goulton St, Hull HU3 4DL, United Kingdom
44 7792 292603
liam@l-nelectrical.co.uk

Service Areas

Hull (Kingston upon Hull)

Certifications

L-N Electrical Services Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – UK electrical safety compliance.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

L-N Electrical Services Ltd provides warranties aligned with UK solar industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of expertise in electrical and renewable energy services

Projects Completed

Dozens of residential and commercial installations completed successfully

Customer Reviews

Read what our customers have to say about their experience with L-N Electrical Services Ltd Solar Solutions

Excellent service. Liam was quick to respond to my query and able to fit me in at short notice. The job he quoted for was very reasonable and he did an excellent job. I am very happy with his work and would definitely use his services again and would recommend him to anyone who needs a reliable electrician.

Richard Horsfield

L-N Solar was a very efficient company. We had solar panels on our garage and a battery installed. This was done quickly and professionally. We are happy to recommend them.

Philip Dore

Liam carried out four electrical jobs at my mum’s house yesterday. Inevitably, due to the age of the house and of my mum, what should have been small jobs got bigger and bigger but he carried out all works efficiently and with good humour, and for a good price. I would highly recommend him and we are going to use him again.

Fiona Harbord

Frequently Asked Questions

What is the relationship between L-N Electrical and solar installation?

L-N Electrical trades under L-N Solar for solar installations; they are MCS-accredited installers for solar, battery storage, EV charging, etc.

What regions do they serve?

They are based in Hull and serve Hull & East Yorkshire, offering renewable services locally.

What credentials or accreditations do they have?

They list being RECC and TrustMark registered, MCS accredited, and also are NICEIC / electrical contractors.

Get a Free Solar Quote

Interested in L-N Electrical Services Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.