Leeds

Leeds Solar

Leeds Solar delivers tailored solar and renewable energy systems across West Yorkshire, focusing on durability, cost savings, and local customer service.
★★★★★  
5
👥
24
Reviews
🏆Elite+ Installer

About

Leeds Solar is a specialist renewable energy company based in West Yorkshire, focusing on solar PV installations, battery storage, and sustainable energy systems for homes, businesses, and community projects. With over a decade of experience, the company has established itself as one of the region’s most trusted solar providers, delivering high-quality installations tailored to the unique needs of each client.

Leeds Solar’s mission is to make solar energy accessible and affordable, helping households and organizations reduce their carbon footprint while achieving long-term energy savings. Their vision is to support Yorkshire and the wider UK in transitioning toward a low-carbon, sustainable future by empowering communities with clean, efficient solar technologies.

With a strong reputation for customer service, transparent pricing, and technical expertise, Leeds Solar has successfully completed hundreds of projects across the region. Their team of renewable energy specialists provides end-to-end services, ensuring every installation delivers maximum performance, reliability, and long-term value.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar panel systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar maintenance and aftercare

✔️ Community and non-profit renewable projects

✔️ Energy audits and consultation

Products & Manufacturers

Leeds Solar works with leading renewable energy manufacturers to ensure efficient and long-lasting installations:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

10, Goldspot Business Centre, Forge Ln, Armley, Leeds LS12 2PY, United Kingdom
44 113 335 0533
info@leeds-solar.co.uk

Service Areas

Leeds

Certifications

Leeds Solar operates with the following certifications and industry standards:

  • MCS (Microgeneration Certification Scheme) – accredited solar PV installations.
  • NICEIC – compliance with UK electrical safety regulations.
  • RECC (Renewable Energy Consumer Code) – consumer protection and fair practices.
  • ISO 9001/14001 – quality management and environmental responsibility.

Warranty Information

Leeds Solar offers warranties aligned with UK solar industry practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Over 10 years of renewable energy expertise

Projects Completed

Hundreds of residential, commercial, and community solar projects across West Yorkshire and beyond

Customer Reviews

Read what our customers have to say about their experience with Leeds Solar Solar Solutions

Leeds Solar are brilliant! Before, during & after installation they are courteous, knowledgeable and helpful. The options around solar energy can be a bit complicated but they make it very straightforward to understand what system is best for you. They also provide support to get the most out of the system after it has been installed too. The installation is to a very high standard and they work with you to get the details right and explain the best installation options. Highly recommended!

Ian C

I can highly recommend Leeds Solar for Solar PV installation. They installed a system for my mother in law and she had nothing but praise for them and is very happy with system they installed. The price they charged was more competitive than the other quotes received so another positive.

Steve Andrews

I recently engaged Leeds Solar to supply and install a in-roof solar array and house battery, as part of a full re-roof project. They were extremely professional and we have been very happy with the result. I’d have no hesitation in using them again in the future.

Richard

Frequently Asked Questions

How long has Leeds Solar been in business?

Leeds Solar has been designing and installing solar systems since 2010.

What areas does Leeds Solar serve?

They serve Leeds and West Yorkshire and handle both domestic and commercial roofs of all sizes.

Does Leeds Solar offer monitoring or maintenance services?

They are MCS certified and offer full installation and support; many installers of this sort include monitoring and maintenance — you should confirm with them.

Get a Free Solar Quote

Interested in Leeds Solar? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.