London

Keenan Electrical and Solar Ltd

Keenan Electrical and Solar Ltd offers expert solar PV installations and electrical services focused on delivering reliable green energy and solar solutions.
★★★★★  
5
👥
35
Reviews
🏆Elite+ Installer

About

Keenan Electrical and Solar Ltd is a London-based renewable energy and electrical contracting company, specializing in solar PV installations for residential and commercial clients. With a strong reputation for quality and customer satisfaction, the company has achieved a 5-star rating backed by over 35 customer reviews, highlighting its professionalism, excellent workmanship, and reliable service.

Keenan Electrical and Solar Ltd combines expertise in both electrical contracting and renewable energy, ensuring each solar PV system is designed and installed to the highest standards of safety, efficiency, and performance. Their mission is to make solar power accessible and affordable, enabling customers to lower energy costs, reduce carbon footprints, and contribute to the UK’s clean energy goals.

With high scores in product quality, installation service, and warranties, the company has become a trusted partner for households and businesses in London and beyond. Their vision is to integrate renewable energy into everyday living, empowering clients with sustainable and cost-effective energy solutions.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar systems

✔️ Battery storage solutions

✔️ EV charging point installations

✔️ Electrical contracting and upgrades

✔️ Solar maintenance and servicing

✔️ Energy consultation and audits

Products & Manufacturers

Keenan Electrical and Solar Ltd works with leading renewable technology brands to ensure efficiency and long-term performance:

  • Solar Panels: Trina Solar, Q CELLS, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Portland House, 51 Colney Hatch Ln, Muswell Hill, London N10 1LJ, United Kingdom
442081338704
enquiries@keenan-electrical.co.uk

Service Areas

London

Certifications

Keenan Electrical and Solar Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – ensuring certified solar PV installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – ensuring fair consumer practices.
  • ISO 9001/14001 – quality management and environmental systems.

Warranty Information

Keenan Electrical and Solar Ltd offers warranties consistent with UK solar best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in electrical and renewable energy services

Projects Completed

Dozens of residential and commercial solar installations successfully delivered across London

Customer Reviews

Read what our customers have to say about their experience with Keenan Electrical and Solar Ltd Solar Solutions

I couldn't be happier with the service provided by Keenan Electrical and Solar. Mark and his team were outstanding from start to finish—professional, polite, and incredibly hardworking. They showed up on time every day, worked efficiently, and kept everything tidy throughout the project. What really stood out was their dedication. Rain or shine, they pushed through to make sure the job was completed on time and to a very high standard. The workmanship and attention to detail were excellent, and it’s clear they take real pride in what they do.

Peter Heffer

I tend to never write any public reviews, but in the case of "Keenan Solar" I really must make an exception, as Mark Keenan and his team have done such a superb job! 5* for design, 5* for execution and 5* for being nice guys too. I am totally happy with the solar installation they built for me; Mark carefully listened to my hopes and aspirations and he and his team have built precisely what I was hoping to get. Yes, it took a few days longer than initially planned, but the heavy heatwave hardly helped, nor did my flat roof and the complications it threw up. "Keenan Solar" have truly mastered the job wonderfully - and cleanly - plus they were always very quick to react to any questions I had along the way. What more can I ask for? I wholeheartedly recommend them!

Serge

Five stars here because Mark and his team were quick, efficient and got the job done when they said that they would. The installation was on a house with some awkward architectural features - the walls are as hard as they come. Admittedly in a sunny period, the majority of my generation, 60% in fact, goes back to the grid, although the paperwork for payment is taking a while.

Robin Hall

Frequently Asked Questions

How long has Keenan Electrical and Solar Ltd been in business?

With years of experience in electrical contracting, Keenan Electrical and Solar has expanded into renewable energy to deliver solar solutions across the UK.

Does Keenan Electrical and Solar Ltd handle installation or subcontract?

They manage installations directly, ensuring quality control and compliance with industry standards.

What maintenance services are included?

They provide ongoing system monitoring, maintenance, and support to keep solar panels performing at their best.

Get a Free Solar Quote

Interested in Keenan Electrical and Solar Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.