Leicester

KAS Solar Services Ltd

KAS Solar Services offers electrical and solar installation services across the UK, focusing on reliability, safety and renewable energy solutions.
★★★★★  
5
👥
35
Reviews
🏆Elite+ Installer

About

KAS Solar Services Ltd is a UK-based renewable energy company providing expert solar PV installations, battery storage solutions, and energy efficiency services for residential and commercial clients. Known for its customer-first approach and professional expertise, the company delivers tailored solar systems that help households and businesses reduce energy costs, achieve energy independence, and lower their environmental impact.

The mission of KAS Solar Services Ltd is to make renewable energy simple, affordable, and accessible, ensuring that every installation meets the highest standards of performance and safety. Their vision is to contribute to the UK’s net zero goals by empowering communities with sustainable energy technologies that deliver long-term benefits.

From consultation and bespoke system design through to installation and ongoing maintenance, KAS Solar Services Ltd provides complete end-to-end solutions. With years of industry experience and a skilled team of renewable energy professionals, the company has built a reputation for reliability, transparency, and excellent customer service.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar systems

✔️ Battery storage integration

✔️ EV charging point installation

✔️ Solar maintenance and servicing

✔️ Energy efficiency audits and consultancy

✔️ Financing and renewable support

Products & Manufacturers

KAS Solar Services Ltd works with trusted manufacturers to provide reliable and efficient solutions:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

23 Jacqueline Rd, Markfield LE67 9RD, United Kingdom
44 116 393 0385
Info@kaselectrical.co.uk

Service Areas

Leicester

Certifications

KAS Solar Services Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – ensuring electrical safety and compliance.
  • RECC (Renewable Energy Consumer Code) – protecting consumer rights and ensuring fair practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

KAS Solar Services Ltd provides warranties in line with UK solar industry best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of operation in the renewable energy industry

Projects Completed

Dozens of residential and commercial installations successfully delivered

Customer Reviews

Read what our customers have to say about their experience with KAS Solar Services Ltd Solar Solutions

The service provided by Kaines team was exceptional. They were courteous, respectful, responsive, flexible and supremely professional. They gave advice throughout and listened to all my questions and concerns, and answered them all clearly and honestly. 5 stars does not reflect the value that this team delivers. Thank you so much. And then Brett came out to finish off some work and was amazing!

Lisa Allden

Kaine Has been absolutely brilliant from start to finish. He came out to assess what needed doing and was really clear and concise with what was needed. He came back to me very quickly with the price and then came back to complete the work within a few days of my confirmation, To go ahead Kaine and his team were , excellent They worked very quickly and efficiently, they tidied up after themselves and left no rubbish, and we were very polite and friendly through the whole process. After Having a very, very bad experience with the previous installer, I am absolutely thrilled with the service and installation I got from KAS Solar Services would not hesitate to recommend to anybody

Tina Berridge

Just had 20 all black panels, 7kw Fox inverter and 14.6kwh of Fox cube battery storage. Kaine has been brilliant from the beginning to the end. Answered all my questions - there were a lot!! Worked with me on what I wanted and what would work best. The guy works so hard to give great customer service. Extremely responsive whatever the time or day of the week, including weekends.

kevin dunham

Frequently Asked Questions

What areas does KAS Solar Services serve?

They serve Leicestershire and local areas (as their site calls them “Leicestershire’s local experts”).

What certifications / accreditations does KAS Solar hold?

KAS Solar holds NIC EIC Approved Contractor, MCS certification, SafeContractor, RECC membership, and is OLEV-approved.

How long will it take for solar panels to pay for themselves (with KAS)?

They estimate the payback period for a typical home in Leicestershire is 6 to 10 years, depending on usage, sizing, optional battery, etc.

Get a Free Solar Quote

Interested in KAS Solar Services Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.