
Kane Electrical and Renewable (KER Ltd) is a UK-based company providing expert electrical contracting and renewable energy solutions, including solar PV, battery storage, and EV charging. With a reputation built on professionalism, technical expertise, and customer care, the company serves both residential and commercial clients across the UK.
Their mission is to deliver safe, reliable, and efficient energy solutions that empower customers to cut energy bills, reduce carbon emissions, and achieve long-term energy independence. The company’s vision is to play a leading role in the UK’s transition to net zero by offering affordable, high-quality renewable systems that combine cutting-edge technology with excellent workmanship.
By offering end-to-end services—including consultation, system design, installation, and aftercare—Kane Electrical and Renewable ensures every project is delivered with precision and transparency. Backed by years of electrical expertise, their skilled team ensures that installations meet the highest standards of performance and safety.
Kane Electrical and Renewable partners with trusted renewable energy manufacturers to ensure long-term performance:



Kane Electrical and Renewable operates with or in line with the following certifications:
Kane Electrical and Renewable provides warranty coverage aligned with UK solar industry standards:
English
Several years of combined experience in electrical and renewable energy sectors
Dozens of residential and commercial renewable projects successfully delivered
Joe installed PV panels, a hybrid inverter, a battery system, a hot water diverter and an EV charger for me. All his work is as neat as a pin with absolute attention to detail. He even laid some flooring in my roof space to access the inverter. He is a pleasure to work with and I heartily recommend him and his team.
Joe and his team have worked with Belfast YMCA this year to complete extensive commercial EICR testing and remedial works. We would recommend Kane Electrical and Renewables as a trustworthy team. Joe communicated really well with us, providing detailed quotes, updates on work and any issues that arose.
The team done a fantastic job installing Solar panels on my commercial building.It was done to the highest quality and the customer service before and after the install was brilliant.
Yes — they are MCS registered and members of RECC.
Yes — they offer free quotes and assist with G98/G99 forms for grid connections.
Domestic & commercial solar PV, battery storage, EV charging, and general electrical services.