Manchester

Install Solar Panels

Install Solar Panels specialises in designing and installing rooftop PV systems across the UK, helping clients reduce energy costs and carbon emissions.
★★★★★  
5
👥
36
Reviews
🏆Elite+ Installer

About

Install Solar Panels is a UK-based renewable energy company dedicated to delivering high-quality solar PV systems, battery storage, and EV charging solutions for residential and commercial clients. With a strong focus on affordability, sustainability, and customer care, the company provides tailored renewable systems that help households and businesses cut energy costs, achieve energy independence, and contribute to the UK’s net zero goals.

The mission of Install Solar Panels is to make renewable energy accessible and practical by offering affordable, future-ready solutions backed by professional expertise. Their vision is to empower communities across the UK to embrace solar technologies that provide long-term efficiency, reliability, and environmental benefits.

By offering end-to-end services—from consultation and system design through to installation and aftercare—Install Solar Panels ensures maximum value and performance for every project. Known for transparency, professionalism, and strong after-sales support, the company has become a trusted name in the renewable energy sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar system servicing and maintenance

✔️ Energy consultation and audits

✔️ Flexible financing and renewable support options

Products & Manufacturers

Install Solar Panels partners with trusted renewable energy manufacturers to ensure long-term performance and system reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

44 800 861 1426
info@install-solar.co.uk

Service Areas

Manchester

Certifications

Install Solar Panels operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Install Solar Panels offers warranties aligned with UK solar industry practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of expertise in renewable energy installations

Projects Completed

Dozens of residential and commercial projects delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with Install Solar Panels Solar Solutions

Frequently Asked Questions

What areas does Install Solar Panels serve?

Publicly available listings suggest they operate around Manchester and the North West.

What is the legitimacy of Install Solar Panels?

Their business appears in local directories as a solar installer in the UK, though I did not find a strong official accreditation listing.

What types of solar panels does Install Solar Panels use?

Specific panel brands are not publicly listed; typical practice is to use Tier-1 branded modules and appropriate inverters per project.

Get a Free Solar Quote

Interested in Install Solar Panels? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.