
HS Renewables is a UK-based renewable energy company providing solar PV installations, battery storage, and EV charging solutions for both residential and commercial clients. With a strong commitment to sustainability and customer satisfaction, the company designs and installs bespoke energy systems that reduce energy costs, cut carbon emissions, and deliver long-term efficiency.
The mission of HS Renewables is to make renewable energy accessible, affordable, and practical for households and businesses alike. Their vision is to play a leading role in the UK’s clean energy transition, supporting the drive toward net zero while empowering communities to become more energy independent.
With a skilled team of renewable energy specialists and engineers, HS Renewables provides end-to-end services—from consultation and system design to installation and aftercare. Known for professionalism, transparency, and reliable service, the company has built a strong reputation as a trusted partner in the renewable energy market.
HS Renewables works with leading renewable manufacturers to ensure efficiency and reliability:



HS Renewables operates with or in line with the following certifications:
HS Renewables provides warranties in line with UK solar industry standards:
English
Several years of renewable energy industry experience
Dozens of residential and commercial projects delivered successfully
Shea and the team worked in partnership with me from the initial call I made. I was unsure which solar/battery system would be best suited to my needs, Shea was patient and carefully talked me through many options and questions I had. I settled on a system (17 panels with Sigenergy System) and it was installed on time and to a great quality standard. So far everything has exceeded my expectations. I would have no hesitation recommending HS renewables.
I had 20 panels fitted to house and from start to finish, they have been brilliant. Kept informed throughout. The work was done quickly and cleanly. I would highly recommend, a brilliant company to deal with.Thanks Gemma and Shea, greatly appreciated.
I had the pleasure of engaging Shea at HS renewables for domestic solar, and as part of a community club solar and battery installation. She is very reliable, dependable, will explain the work and give good candid advice.
They provide Solar PV, battery storage, wind turbines, renewables commissioning and EV charging.
Yes — they advertise free quotes and consultations.
They are based in County Derry, Northern Ireland, and serve surrounding areas.