Glasgow

H&R Energy Solutions Ltd

H&R Energy Solutions specializes in solar, storage and energy system integration, offering clients resilient and cost-effective renewables.
★★★★★  
5
👥
161
Reviews
🏆Elite+ Installer

About

H&R Energy Solutions Ltd is a UK-based renewable energy company dedicated to delivering high-quality solar PV systems, battery storage, and sustainable energy solutions for residential and commercial clients. With a strong reputation for professionalism and customer care, the company provides tailored renewable systems designed to help customers cut energy bills, achieve energy independence, and reduce their environmental footprint.

The mission of H&R Energy Solutions Ltd is to make renewable energy simple, affordable, and accessible, ensuring every customer benefits from cost savings and long-term efficiency. Their vision is to support the UK’s clean energy transition by empowering homes and businesses with innovative renewable technologies that align with the nation’s net zero targets.

Offering end-to-end services from consultation and bespoke design to installation and aftercare, the company is recognized for its technical expertise, transparent approach, and dependable after-sales support. With a customer-first philosophy, H&R Energy Solutions Ltd has built lasting relationships with clients across the UK renewable energy market.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar panel servicing and maintenance

✔️ Energy consultation and audits

✔️ Flexible financing and renewable support

Products & Manufacturers

H&R Energy Solutions Ltd works with leading renewable energy brands to ensure efficiency and long-term reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Unit 4, 3 Siding Lane, Glasgow, United Kingdom
44 141 739 3923
info@hnrenergy.co.uk

Service Areas

Glasgow

Certifications

H&R Energy Solutions Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – fair trading and consumer protection.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

H&R Energy Solutions Ltd provides warranty coverage aligned with UK solar industry best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy experience in the UK

Projects Completed

Dozens of residential and commercial projects successfully delivered

Customer Reviews

Read what our customers have to say about their experience with H&R Energy Solutions Ltd Solar Solutions

PLEASE BE AWARE OF THIS COMPANY . I DID DO A REVIEW ON MONDAY BUT I HAD A WORKMAN BESIDE ME TELLING ME WHAT TO WRITE , HE ASKED ME TO DO THIS BEFORE HE LEFT .WHEN I HAD THE GENTLEMEN OUT TO SEE WHAT COULD BE DONE , HE EXPLAINED TO MYSLEF AND MY MUM , WHERE THE FANS WOULD GO AND HOW THEY. INSULATE THE WALLS THIS WAS SHOWN AS OUTSIDE , I AGREED TO THE WORK , THEY ALSO SAID THEY WOULD GIVE ME A BOILER AS A GOOD WILL GESTURE , I CAME HOME YESTERDAY TO MY WALL IN THE LIVING ROOM GETTING SKIMMED , AND MY HALL , I WOULD NEVER HAVE AGRRED TO THIS

Geraldine Fraser

I visited the H&R Energy Solutions website to learn about the free boiler grant scheme. The site was very clear and easy to understand. The information was well presented and the application form was simple to fill in.

Sajid Razzaq

First survey was done well the man was polite. They came to do my stuff and a man knocked and walked in. I felt abit uncomfortable at the start as many walked in as he wasn’t very talkative and was just walking past. Then I hear banging and more people were in my stairs, no announcement or I wasn’t told, which would have been helpful. There was a mistake and they tried to rectify it and the manager came to apologise which was a good thing. The kitchen is in need of work so I can’t say much. But they used my paint and tools and never washed the brushes, they walked off with some of my things such as all of my bin bags. I bought a new roll, and they used one and took the rest. Plus the vents are stained. The loft is done well but the rest I am horrified at

Adam Morris

Frequently Asked Questions

What government schemes does H&R Energy support?

They help homeowners access energy upgrades via ECO4 and GBIS schemes across the UK.

How long has H&R Energy Solutions been in business?

They state they have “over 20 years” of experience in energy solutions.

What maintenance services are included?

While specific coverage isn't detailed publicly, H&R typically handles end-to-end services from consultation through installation; for maintenance you should confirm a service agreement.

Get a Free Solar Quote

Interested in H&R Energy Solutions Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.