Hull

Head-On Renewables

Head-On Renewables offers solar, battery and clean energy services, aiming to guide clients into energy independence and a low-carbon future.
★★★★★  
5
👥
5
Reviews
🏆Elite+ Installer

About

Head-On Renewables is a UK-based renewable energy company dedicated to delivering innovative and sustainable energy solutions for households, businesses, and communities. Specializing in solar PV systems, battery storage, and EV charging, the company focuses on reducing carbon emissions, cutting energy costs, and supporting the UK’s transition to a cleaner, greener future.

The mission of Head-On Renewables is to provide high-quality, affordable renewable energy systems that empower customers to achieve energy independence and long-term savings. Their vision is to accelerate the adoption of renewable technologies across the UK, contributing to a sustainable, low-carbon economy.

With a skilled team of engineers and energy specialists, Head-On Renewables offers end-to-end services from consultation and design to installation and ongoing support. Known for professionalism, transparency, and customer care, the company ensures every project is tailored to individual client needs while delivering maximum efficiency and reliability.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar maintenance and servicing

✔️ Energy consultation and audits

✔️ Financing and renewable support

Products & Manufacturers

Head-On Renewables works with leading global renewable energy brands to ensure performance and durability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

C/o T.E.P.S, Freightliner Rd, Hull HU3 4XL, United Kingdom
44 1482 770214
info@head-onrenewables.co.uk

Service Areas

Hull (Kingston upon Hull)

Certifications

Head-On Renewables operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – ensuring compliance with UK electrical standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical business practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Head-On Renewables provides warranties consistent with UK solar industry standards:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in renewable energy installations

Projects Completed

Dozens of residential and commercial projects completed across the UK

Customer Reviews

Read what our customers have to say about their experience with Head-On Renewables Solar Solutions

Totally recommend this company please read below.Spoke with Head-on Renewable’s about installation of solar panels and battery storage from the first phone call I found them to be completely professional.There installation engineer came out to my property at the time he said on the phone for the first consultation and talked me through all the options for best results for my needs.

Sean Sumpton

Would definitely recommend this company. Very professional from start to finish replaced my solar panels converter promptly and efficiently and at a reasonable cost.... thanks again

Paul Rogers

Very pleased with the service and help I received from Head-on-Renewables, would definitely recommend them.

Olwen Wood

Frequently Asked Questions

What types of systems does Head-On Renewables install?

They install solar panels, battery storage systems, and electric vehicle chargers for residential and commercial clients.

What accreditation or credentials does Head-On Renewables hold?

Head-On is MCS and RECC accredited, which are recognized certifications in the UK renewable sector.

How long has Head-On Renewables been in business / how much experience do they have?

They claim “over 25 years of experience in the electrical and renewable energy industry.

Get a Free Solar Quote

Interested in Head-On Renewables? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.