London

Green Power Installations

Green Power Installations specializes in solar panel and renewable energy system installations for residential and commercial properties across the UK.
★★★★★  
0
👥
0
Reviews
🏆Elite+ Installer

About

Green Power Installations is a London-based renewable energy company specializing in the design, installation, and maintenance of solar PV systems for residential and commercial clients. With a strong focus on sustainability and affordability, the company provides tailored solutions that enable customers to cut energy bills, lower carbon emissions, and achieve energy independence.

Built on the values of professionalism and innovation, Green Power Installations is dedicated to helping homes and businesses adopt renewable technologies that contribute to a cleaner, greener future. Their mission is to make renewable energy practical and accessible for everyone, while their vision is to support the UK’s transition to net zero through reliable solar energy solutions.

With a growing customer base and positive reviews highlighting product quality and aftercare, Green Power Installations has established itself as a trusted choice in London and the wider UK. The company delivers end-to-end services, from consultation and design to installation and maintenance, ensuring long-term system performance and customer satisfaction.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar maintenance and repairs

✔️ Energy audits and consultation

✔️ Flexible financing and support

Products & Manufacturers

Green Power Installations works with trusted brands in the renewable energy sector:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

84 George Cres, London N10 1AN, United Kingdom
442088836487
inquiries@gpinstallations.com

Service Areas

London

Certifications

Green Power Installations operates with or in line with leading UK industry certifications:

  • MCS (Microgeneration Certification Scheme) – certified installations.
  • NICEIC – compliance with electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – ensuring consumer protection.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Green Power Installations provides warranties consistent with UK solar best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in renewable energy installations

Projects Completed

Hundreds of solar and renewable projects successfully delivered across London and the UK

Customer Reviews

Read what our customers have to say about their experience with Green Power Installations Solar Solutions

Frequently Asked Questions

How long has Green Power Installations been in business?

Green Power Installations has years of experience delivering renewable energy projects across the UK.

What types of solar panels does Green Power Installations use?

They install efficient, high-quality solar PV systems from trusted manufacturers.

Does Green Power Installations also offer battery storage or EV charging?

Yes, they provide complete renewable energy packages, including battery storage and EV charging solutions.

Get a Free Solar Quote

Interested in Green Power Installations? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.