London

Go Greener Energy Limited

Go Greener Energy Limited provides solar panel installations and battery storage solutions for homes and businesses, helping clients maximize energy savings and reduce carbon footprints.
★★★★★  
4
👥
45
Reviews
🏆Elite+ Installer

About

Go Greener Energy Limited is a UK-based renewable energy company focused on delivering high-quality solar PV installations, battery storage solutions, and energy efficiency services for residential and commercial clients. With a strong commitment to sustainability, the company helps customers lower energy costs, reduce carbon footprints, and move towards energy independence.

Built on the values of professionalism, innovation, and customer care, Go Greener Energy Limited designs and installs tailored solar systems that maximize efficiency and long-term performance. Their mission is to make renewable energy accessible, affordable, and practical for households and businesses, while their vision is to contribute to the UK’s ambitious clean energy targets and global net zero goals.

With strong ratings across product quality, installation service, and customer satisfaction, Go Greener Energy Limited has established itself as a reliable choice in the solar energy sector. The company provides end-to-end services, ensuring that each project—from consultation to installation and aftercare—is delivered with precision and transparency.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging point installation

✔️ Solar panel maintenance and repairs

✔️ Energy efficiency audits and consultation

✔️ Flexible financing and renewable support options

Products & Manufacturers

Go Greener Energy Limited partners with leading renewable technology manufacturers, including:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Rolec, Zappi

Project Gallery

Contact Information

Office 1, RYKNILD HOUSE, Burnett Rd, Streetly, Sutton Coldfield B74 3EL, United Kingdom
441214934095
info@go-greener.uk

Service Areas

London

Certifications

Go Greener Energy Limited operates in line with recognized UK industry standards:

  • MCS (Microgeneration Certification Scheme) – ensuring solar PV quality.
  • NICEIC – compliance with UK electrical regulations.
  • RECC (Renewable Energy Consumer Code) – customer protection and fair trading.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Go Greener Energy Limited provides warranties consistent with UK solar industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in renewable energy installations

Projects Completed

Dozens of residential and commercial solar projects successfully completed across the UK

Customer Reviews

Read what our customers have to say about their experience with Go Greener Energy Limited Solar Solutions

Having done my research and getting several quotes for my solar system ( which I found a nightmare to navigate with various systems and products available far too many to make a simple decision) I can’t recommend Go Greener Energy highly enough. Excellent service from day one, Craig was informative and knowledgeable with no pressure to purchase, The fitting team were first class and very professional. The work was exceptional leaving no mess. Explanation of the system and how it works was very clear and easy to understand.

Adrian Hill

From the moment Alastair visited my house to explain the procedure and provide advice concerning the number of recommended solar panels and battery, I received excellent care and attention from both him and the back room staff at Go Greener Energy Ltd. The installation was extremely efficient and was completed within one day on the date specified.

Len Tompsett

An excellent service beginning with a very comprehensive sales meeting with Alastair Marchbank, prompt delivery of the equipment, and a first class installation team who were very friendly doing a clean and tidy job. I would recommend this company to anyone considering a solar energy installation. High class job at a very competitive price.

David Evans

Frequently Asked Questions

Is Go Greener Energy Limited a legitimate solar installer?

Yes, Go Greener Energy is an accredited UK-based company specializing in solar panels and renewable energy systems.

Does Go Greener Energy Limited offer free quotes or consultations?

Yes, they provide free consultations and property surveys to recommend the best solar solutions.

How eco-friendly are Go Greener Energy Limited’s solar solutions?

Their installations are designed to cut carbon emissions and promote sustainable living.

Get a Free Solar Quote

Interested in Go Greener Energy Limited? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.