Bristol

Go Green Solar Ltd

Go Green Solar Ltd designs and installs solar systems across the UK, helping homes and businesses reduce energy costs and carbon footprints.
★★★★★  
5
👥
24
Reviews
🏆Elite+ Installer

About

Go Green Solar Ltd is a UK-based renewable energy company specializing in solar PV systems, battery storage, and EV charging solutions. With a strong commitment to sustainability and customer satisfaction, the company provides bespoke renewable energy solutions that help households and businesses lower energy bills, reduce carbon footprints, and move towards energy independence.

The mission of Go Green Solar Ltd is to make renewable energy affordable and accessible to all by combining high-quality products with professional installation and dependable aftercare. Their vision is to play an active role in the UK’s clean energy transition by enabling communities to embrace sustainable energy technologies that deliver long-term performance and savings.

With a team of experienced engineers and renewable specialists, the company offers a complete end-to-end service covering consultation, bespoke system design, installation, and maintenance. Known for reliability, professionalism, and transparent pricing, Go Green Solar Ltd has earned a reputation as a trusted partner in the UK solar sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar panel servicing and maintenance

✔️ Energy audits and consultation

✔️ Financing and renewable support

Products & Manufacturers

Go Green Solar Ltd partners with leading global renewable manufacturers to ensure reliability and long-term system performance:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Unit 4, Bristol Vale Trading Estate, Bristol, BS3 5RJ
44 117 964 0078
hello@gogreensolar.co.uk

Service Areas

Bristol

Certifications

Go Green Solar Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – ensuring fair consumer protection.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Go Green Solar Ltd provides warranties aligned with UK solar industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in the renewable energy sector

Projects Completed

Dozens of residential and commercial solar installations across the UK

Customer Reviews

Read what our customers have to say about their experience with Go Green Solar Ltd Solar Solutions

Outstanding professional support. We had been badly let down by another company and Go Green Solar responded promptly with reasonable prices, helpful and supportive staff, and a focus on resolving our problem. They made every step of the process pain free and smooth. Our new inverter is helping helping generate solar energy again.

Richard Drew

Was considering solar after my son had his system installed also by Go Green Solar LTD. I had tried to get a quote elsewhere without any results. Went on the Go Green solar Website over weekend and left my details. Had an email Monday morning and supplied budget and situation. Had a full documented quote in under 2 hours. Fantastic survey within 2 days by very knowledgeable Paul. System was fitted 2 weeks later over 2 days. Fantastic team of guys led by Ashley installed all the equipment in such a tidy and professional way. I am so pleased with the results. Rob and Paul know their stuff and after care has already started before I pay the bill.

Doug Johnson

We had an excellent experience with Go Green Solar for the installation of our solar panels and PV battery. Before the installation, we had a thorough survey with a report breaking down the potential savings and benefits. All the different workmen who visited our home for the installation were polite and tidy. We had great communication during the set up and follow up support straight away when there was an issue after installation. We are able to monitor everything easily on our system via an app. I would highly recommend for anyone who is interested in solar energy for their home.

Alice Archer

Frequently Asked Questions

What areas does Go Green Solar Ltd serve?

They cover Bristol and the South West (UK) for solar PV, EV charging, and heat pump installations.

Does Go Green Solar Ltd offer free quotes or consultations?

Yes — their site invites users to “Get a Free Quote”.

What types of renewable technologies does Go Green Solar provide?

They offer Solar PV systems, battery storage, air source heat pumps, and EV charging solutions.

Get a Free Solar Quote

Interested in Go Green Solar Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.