Nottingham

Generate Solar EV Ltd

Generate Solar EV Ltd integrates solar installations and EV charging infrastructure, empowering homes and businesses to adopt clean, self-powered mobility.
★★★★★  
5
👥
34
Reviews
🏆Elite+ Installer

About

Generate Solar EV Ltd is a UK-based renewable energy company specializing in solar PV installations, battery storage, and electric vehicle (EV) charging solutions. With a strong focus on innovation, sustainability, and customer care, the company designs and installs tailored renewable energy systems that help households and businesses reduce energy bills, achieve energy independence, and contribute to the UK’s net zero future.

The mission of Generate Solar EV Ltd is to empower communities to transition to clean energy by providing cost-effective and future-ready solutions. Their vision is to integrate solar power and electric mobility into everyday life, creating a sustainable energy ecosystem that benefits both individuals and the environment.

From consultation and system design to installation and aftercare, the company offers complete end-to-end services. Known for technical expertise, professionalism, and reliable customer support, Generate Solar EV Ltd has established itself as a trusted partner for renewable energy and EV infrastructure across the UK.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar panel maintenance and servicing

✔️ Energy audits and consultation

✔️ Flexible financing and renewable support options

Products & Manufacturers

Generate Solar EV Ltd works with globally recognized renewable energy manufacturers to ensure reliable and efficient systems:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Unit 2, Headstocks Industrial Park, Merchant Wy, Watnall, Nottingham NG16 1AA, United Kingdom
44 115 783 6409
info@generate-solarev.co.uk

Service Areas

Nottingham

Certifications

Generate Solar EV Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – electrical safety compliance.
  • RECC (Renewable Energy Consumer Code) – consumer rights and ethical trading.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Generate Solar EV Ltd provides warranty coverage aligned with UK solar industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.
  • EV charging equipment – typically 3–5 years manufacturer’s warranty.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in renewable energy and EV infrastructure

Projects Completed

Dozens of residential and commercial solar and EV projects across the UK

Customer Reviews

Read what our customers have to say about their experience with Generate Solar EV Ltd Solar Solutions

Generate Solar EV LtdA great customer service from start to finishExcellent on pricingHelpful throughout the design, installation and aftercare process

Yusef Latif

A big thank you to Kris, Adam and their team for a perfect and professional job on the installation of our 10 panel solar system. Would certainly recommend this fab team. Paul & Amanda

Amanda Dunn

What an excellent company to deal with. Everyone I spoke to was helpful, professional and very friendly. Everything was explained to me in layman's terms and I was kept informed every step of the way as to what was happening.From the first discussion of what I wanted/needed to installation and commissioning has been a totally stress free experience. Thank you to everyone involved.

Suzanne Glasby

Frequently Asked Questions

What areas does Generate Solar EV serve?

Publicly available information is not clearly found — contact them to verify service coverage.

Does Generate Solar EV offer battery storage or EV charging integration?

Based on the name (“Solar EV”), it's likely they integrate EV charging, but no definitive public information was found.

What types of solar technology does Generate Solar EV install?

No public pages explicitly list panel brands or types — you may ask them directly for specs.

Get a Free Solar Quote

Interested in Generate Solar EV Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.