Nottingham

GEM Solutions UK Ltd

GEM Solutions UK Ltd, founded in 2010, is an electrical contracting & solar installation firm providing sustainable energy solutions across Nottinghamshire and beyond.
★★★★★  
4
👥
6
Reviews
🏆Elite+ Installer

About

GEM Solutions UK Ltd is a UK-based renewable energy and sustainability company providing tailored solar PV systems, battery storage, and energy efficiency solutions for both residential and commercial clients. The company is dedicated to helping households and businesses reduce energy bills, improve efficiency, and move toward energy independence while supporting the UK’s transition to a low-carbon economy.

With a mission to deliver affordable, practical, and sustainable energy solutions, GEM Solutions UK Ltd combines modern technology with expert engineering to design systems that maximize performance and reliability. Their vision is to empower communities across the UK to embrace renewable energy as a step toward a greener and more sustainable future.

The company offers end-to-end services, including consultation, bespoke design, professional installation, and ongoing support. Known for its customer-first approach and technical precision, GEM Solutions UK Ltd has built a reputation for transparency, professionalism, and delivering high-quality renewable energy systems.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar energy systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar system servicing and maintenance

✔️ Energy audits and consultation

✔️ Financing and renewable support options

Products & Manufacturers

GEM Solutions UK Ltd partners with trusted renewable energy manufacturers to deliver efficient and long-lasting systems:

  • Solar Panels: Trina Solar, Q CELLS, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

7 Lockwood Cl, Nottingham NG5 9JN, United Kingdom
44 115 967 1080
info@gemsolutions.org.uk

Service Areas

Nottingham

Certifications

GEM Solutions UK Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified renewable energy installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical practices.
  • ISO 9001/14001 – quality and environmental management standards.

Warranty Information

GEM Solutions UK Ltd provides warranties consistent with UK solar industry best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of expertise in renewable energy and sustainable technologies

Projects Completed

Dozens of residential and commercial projects successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with GEM Solutions UK Ltd Solar Solutions

Well we decided to go solar so the first thing you do after some research is send some emails to potential companies for installation quotes.Being an electrical contacts manager part of my job is doing electrical quotations, unfortunately as a company we are not a registered solar installer etc. I must say from about 10 emails I sent some of the quotes I received I do not even know how these companies get a reply never mind an order!

Rick

Saw one of their drivers driving at 70mph, one handed whilst texting on his mobile phone. Van reg was FD71 EAK. Three days ago I reported it to the company and asked.them to call me to discuss what is witnessed which also included the driver tailgating at speed. So far the company has not returned my call which suggests they feel that this behaviour is acceptable. Not sure I would want to do business with a company that does not take this seriously and seems happy to let their staff break the law and not punish them for doing so.

Paul Dexter

Extremely good service from GEM all round. Installation was seamless from start the finish. Estimated the install would take a full 3 days but was finished by noon on the last day.The quotation was a fair price, and the best equipment was advised for the size of the solar system we required. (SolarEdge)We also had replacement LED lights fitted on a Saturday when our offices were closed. This also was pain free.

Dean Sanderson

Frequently Asked Questions

How long has GEM Solutions been in business?

GEM Solutions was established in 2010.

Does GEM Solutions handle both residential & commercial solar?

Yes — they supply, install, service, and repair solar systems for both homes and businesses.

What accreditations / certifications does GEM Solutions hold?

Their team consists of fully qualified electricians; they operate under standard electrical rules and provide certification on completion (e.g. NICEIC / Part P).

Get a Free Solar Quote

Interested in GEM Solutions UK Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.