Sheffield

Future Proof Solar

Future Proof Solar helps homes and businesses adapt to tomorrow’s energy by designing solar + storage systems built for durability and efficiency.
★★★★★  
5
👥
215
Reviews
🏆Elite+ Installer

About

Future Proof Solar is a UK-based renewable energy company dedicated to providing high-quality solar PV installations, battery storage, and sustainable energy solutions. With a strong focus on innovation and reliability, the company helps households and businesses reduce their energy costs, increase independence from the grid, and contribute to the fight against climate change.

The mission of Future Proof Solar is to deliver energy systems that are not only efficient today but also “future-proof,” designed to perform reliably for decades. Their vision is to make clean energy accessible to all, supporting the UK’s transition to a net zero economy with practical, cost-effective, and environmentally responsible solutions.

Future Proof Solar provides comprehensive services, from consultation and design to installation and aftercare. Known for professionalism, customer-first service, and technical expertise, the company has built a strong reputation for delivering tailored renewable energy systems that offer long-term value and sustainability.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar servicing and maintenance

✔️ Energy efficiency consultation and audits

✔️ Financing and renewable support options

Products & Manufacturers

Future Proof Solar works with leading renewable technology manufacturers to ensure high performance and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Retford Enterprise Centre, Randall Way, Retford DN22 7GR, United Kingdom
01777 712647
info@fpi-group.co.uk

Service Areas

Sheffield

Certifications

Future Proof Solar operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – ensuring consumer protection and ethical practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Future Proof Solar offers warranties in line with UK solar industry best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy expertise

Projects Completed

Dozens of residential and commercial projects successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with Future Proof Solar Solar Solutions

I recently had the pleasure of working with Future Proof Solar for the installation of a Sigenergy solar and battery system, and I couldn’t be more pleased with the entire experience. From start to finish, the team was incredibly helpful and took the time to explain everything thoroughly, ensuring I fully understood how the system works.

Gareth Parris

Absolutely delighted with Future Proof Solar who supplied and fitted a Tesla Power Wall 3 Expansion pack to my existing solar/battery installation.

Steven Timperley

From the initial order to completion of the installation, the process was fully explained and implemented. Sean and Liam were always approachable and helpful with timescales and administration.Cory who installed the Solar panels and Josh the electrician, did a fantastic job, minor disturbance, very friendly and after finishing their work ensured that the area was cleaned thoroughly.The completion certification was emailed within days of the completion and Liam then assisted with ensuring that the SEG was applied for correctly.

phillip dunning

Frequently Asked Questions

What warranties does Future Proof Solar provide?

(No public data found) — typical warranties in the industry are 10–25 years on panels plus workmanship coverage.

Does Future Proof Solar help with government incentives or grants?

(Not clearly stated) — many UK installers assist customers with available schemes; ask them directly.

What areas does Future Proof Solar serve?

(No public info to confirm) — you should check their service coverage through their website or direct enquiry.

Get a Free Solar Quote

Interested in Future Proof Solar? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.