London

Fogstar Ltd

Fogstar Ltd, MCS certified, installs solar panels, battery storage, and EV charging units with expert engineering support across Surrey and Wimbledon.
★★★★★  
5
👥
1338
Reviews
🏆Elite+ Installer

About

Fogstar Ltd is a UK-based energy solutions provider, specializing in advanced battery technologies, solar integration, and renewable energy systems. Renowned for its innovation and exceptional customer service, Fogstar has built a strong reputation in the UK energy market, offering products and services that empower both residential and commercial clients to achieve greater energy independence.

The company’s mission is to deliver reliable, safe, and efficient energy storage and solar solutions, helping customers reduce energy costs and minimize carbon emissions. With thousands of positive customer reviews and an outstanding reputation for product quality, Fogstar has become a trusted partner in the renewable energy and battery storage sector.

Fogstar’s expert team ensures every project is customized to meet the needs of its clients, delivering tailored solar PV and storage solutions that maximize efficiency and sustainability. By embracing cutting-edge battery technology and solar innovation, Fogstar continues to support the UK’s transition toward clean, renewable energy, driving a more sustainable and energy-secure future.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar and battery storage systems

✔️ Advanced battery supply and integration

✔️ EV charging infrastructure installation

✔️ Solar system maintenance and servicing

✔️ Energy efficiency and consultation services

✔️ Financing and renewable support options

Products & Manufacturers

Fogstar Ltd works with leading global energy brands to ensure reliable performance and efficiency:

  • Solar Panels: Trina Solar, JA Solar, SunPower, Q CELLS, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD, Fogstar’s proprietary battery solutions
  • EV Charging: Pod Point, Rolec, Zappi

Project Gallery

Contact Information

Moons Moat North Industrial Estate, Unit 21 Walkers Rd, Redditch B98 9HE, United Kingdom
441527757980
customerservice@fogstar.co.uk

Service Areas

London

Certifications

Fogstar Ltd operates with or in line with recognized UK certifications:

  • MCS (Microgeneration Certification Scheme) – assurance of solar installation quality.
  • NICEIC – compliance with electrical standards.
  • RECC (Renewable Energy Consumer Code) – ensuring consumer protection.
  • ISO 9001/14001 – quality and environmental management standards.

Warranty Information

Fogstar Ltd provides warranties consistent with UK renewable energy standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage solutions – 5–10 years depending on manufacturer and product.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in renewable energy and battery technology

Projects Completed

Thousands of projects completed, with a strong customer base across the UK

Customer Reviews

Read what our customers have to say about their experience with Fogstar Ltd Solar Solutions

I recently ordered the Fogstar 18650 4000mah 10A for the first time, and I have to say, I was pleasantly surprised to find that the battery came with individual cartridges. It's amazing to see the air pump working again! I really appreciate how well everything worked out, and I definitely plan on ordering a few more in the future. Thank you for such a great experience!

Michael Chum

Mixed views, some good some not so good. Initially impressed with prompt delivery and tech support regarding charging of cells. I note that the website now mentions constant voltage psu. When building system my case did not match the "new" you tube "instruction" video. Be aware that the fuse stud posts are either vertically or horizontally placed. As I had been supplied the horizontal style I was unable to complete my build due to incorrect or lacking parts or i should have been supplied the vertical style which would have worked with parts supplied! The new instructional YouTube shows vertical placement . Presently awaiting update from email conversation as to resolution.

Anon Mouse

A truly professional company with reliable products and services. Just got a home solar battery from them for a superb price and it was a DIY pack and I was able to assemble it without a single issue just by watching their tutorial video on YouTube. Also I was able to connect it to my Sunsynk inverter just by using a standard pre made lan cable. All works perfectly. The balance of the cells is ridiculously good, within 10-15mV across 16 cells.

patrik bartos

Frequently Asked Questions

What areas does Solar Panel Installers Wimbledon serve?

They provide professional solar panel installation services in Wimbledon and nearby areas of South West London.

Does Solar Panel Installers Wimbledon offer free quotes or consultations?

Yes, they offer free consultations and quotations to help customers choose the right solar system.

What warranties does Solar Panel Installers Wimbledon provide on panels and installation?

They offer manufacturer-backed warranties and installation guarantees for long-term performance.

Get a Free Solar Quote

Interested in Fogstar Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.