.png)
FDG Group Limited is a UK-based company specializing in renewable energy and electrical contracting services, with a focus on solar PV installations, battery storage, and sustainable energy solutions. Serving both residential and commercial clients, the company is committed to delivering high-quality systems that improve energy efficiency, lower costs, and support the UK’s transition to a greener future.
The mission of FDG Group Limited is to provide practical, affordable, and innovative renewable energy solutions that meet the needs of modern households and businesses. Their vision is to empower communities to achieve energy independence while reducing environmental impact through the adoption of solar energy and clean technologies.
With a professional team of qualified engineers and electricians, FDG Group Limited provides comprehensive services including consultation, bespoke system design, installation, and aftercare. The company has built a reputation for professionalism, transparency, and technical excellence, making it a reliable partner in the renewable energy sector.
FDG Group Limited partners with reliable renewable energy brands to deliver efficient and future-ready solutions:



FDG Group Limited operates with or in line with the following certifications:
FDG Group Limited offers warranties in line with UK solar industry standards:
English
Several years of renewable energy and electrical contracting expertise
Dozens of residential and commercial installations across the UK
We have had FDG fit solar panels, inverter, batteries, car charger and a heatpump to our 1960’s house. They have also changed and added some radiators. All the work was done professionally and everything was left tidy with all rubbish taken away.
An update on the review I posted in September. At our 1920s house in West Bridgford, Steve and the FDG lads have fitted a heat pump, a battery, a new inverter, a car charger, and six solar panels in addition to those we already had. Our old radiators will be replaced next week. The standard of work has been excellent, with particular thanks going to John the plumber. Yes, there have been a few delays but I’m satisfied these have been beyond FDG’s control. No installation of new tech can be entirely trouble free, but in the first few days of operation John was always
Excellent response to a breakdown, very prompt, polite and knowledgeable. Amazingly my Solar Edge inverter is covered by a 12 year warranty, which was a pleasant surprise. Would definitely recommend FDG and Solar Edge
FDG offers a 2-year workmanship warranty on most solar, battery and heat pump systems, plus manufacturing warranties up to 30 years.
FDG acts as a credit broker and offers loan products via partner lenders.
FDG Group Ltd is actively registered (Company No. 09188124), incorporated in 2014.