London

Eva's Energy

Eva's Energy designs, installs, and operates solar power systems with a unique contract model allowing customers to save on energy costs and own the system at contract end.
★★★★★  
5
👥
33
Reviews
🏆Elite+ Installer

About

Eva's Energy is a UK-based renewable energy company specializing in solar PV installations, battery storage, and sustainable energy solutions for both residential and commercial clients. With a strong reputation for professionalism, technical expertise, and customer satisfaction, the company has become a trusted partner for households and businesses seeking to embrace clean, affordable, and reliable renewable energy.

Eva's Energy’s mission is to make solar power more accessible and to empower customers with the ability to take control of their energy usage, lower utility bills, and contribute to reducing carbon emissions. Backed by excellent customer reviews and high ratings in installation quality, service delivery, and aftercare support, Eva’s Energy has established itself as a reliable player in the UK’s growing renewable energy sector.

By offering personalized system design, expert installations, and comprehensive maintenance services, Eva's Energy ensures each client receives maximum efficiency and long-term value from their investment. With a forward-thinking approach, the company continues to support the UK’s clean energy goals, providing innovative solutions that promote energy independence and sustainability.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar energy systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar panel servicing and maintenance

✔️ Energy consultation and efficiency audits

✔️ Flexible financing and grant support

Products & Manufacturers

Eva's Energy partners with trusted manufacturers to ensure high-quality and efficient energy solutions:

  • Solar Panels: Trina Solar, Q CELLS, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

27 Gilbert Rd, Bromley BR1 3QP, United Kingdom
447503529702
info@evasenergy.co.uk

Service Areas

London

Certifications

Eva's Energy works in line with leading UK renewable energy certifications:

  • MCS (Microgeneration Certification Scheme) – ensuring high-quality solar PV installations.
  • NICEIC – certified electrical compliance.
  • RECC (Renewable Energy Consumer Code) – consumer protection and fair practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Eva's Energy offers warranties consistent with solar industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in the UK solar energy market

Projects Completed

Hundreds of residential and commercial solar installations successfully completed

Customer Reviews

Read what our customers have to say about their experience with Eva's Energy Solar Solutions

We are very happy with the installation of an 8-panel solar system with 9.5kWh battery. Matt and his team were great! We originally got three quotes, all of which offered slightly different solutions. We decided to go with Eva's Energy because we wanted a local installer and the quote was very competitive for the solution offered. Once we had decided, Matt worked extremely efficiently to get the system installed quickly so that we can make the most of the sunny weather and to suit our timeline. The installation took two days with Matt, an electrician and a roofer. Matt took care of it all and the result looks great with all cables laid neatly. Since the install we have been running almost exclusively on solar power. We would absolutely recommend Eva's Energy.

Jana Kim

Eva's Energy have put 13 panels on three sections of our roof. Since they commissioned the system two weeks ago (May 2025), less than 1% of our electricity has come from the grid. (I know it's been sunny, but still. ...). The team were brilliant to deal with, from discussing the different types of system, where the battery and inverter could go, and so on, to installation and commissioning. They did the job on time, to budget. When they were here working, they were a pleasure to have in the house.

Simon Pirani

Matt and his team installed 23 panels and a 20kW battery system on my house, and I couldn't have asked for better service. Matt is friendly, reliable, honest and pays attention to detail. He took time in explaining all the options to me and at no point did I feel rushed or pressured to decide what I wanted. He's done a really neat and tidy job, was very respectful of my property and kept me informed throughout the process. I would highly recommend Eva's Energy without any reservations.

Team Tantrige

Frequently Asked Questions

How long has Eva's Energy been in business?

Eva's Energy has been serving UK customers for several years, offering reliable solar and renewable energy solutions.

What types of solar panels does Eva's Energy use?

They use efficient, industry-standard solar panels sourced from leading manufacturers for long-lasting performance.

Does Eva's Energy also offer battery storage or EV charging?

Yes, they offer full renewable energy packages, including battery storage and EV charging installations.

Get a Free Solar Quote

Interested in Eva's Energy? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.