Birmingham

EV-PV Ltd

EV-PV Ltd combines electric vehicle charging and solar energy solutions, enabling homes and businesses to generate, store and use clean energy seamlessly.
★★★★★  
5
👥
152
Reviews
🏆Elite+ Installer

About

EV-PV Ltd is a UK-based renewable energy company specializing in solar PV systems, battery storage, and electric vehicle (EV) charging solutions. With a strong focus on sustainability and innovation, the company delivers integrated clean energy systems designed to help clients cut energy costs, achieve energy independence, and reduce their carbon footprint.

EV-PV Ltd’s mission is to accelerate the UK’s transition to a low-carbon future by combining solar generation with cutting-edge storage and EV charging technologies. Their vision is to empower households and businesses with practical, affordable, and future-ready renewable energy solutions.

The company provides end-to-end services, from consultation and bespoke design through to professional installation and ongoing maintenance. With a reputation for customer-focused service and technical expertise, EV-PV Ltd ensures every project delivers efficiency, safety, and long-term value.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar maintenance and servicing

✔️ Energy consultation and audits

✔️ Financing and renewable support options

Products & Manufacturers

EV-PV Ltd works with globally recognized renewable manufacturers to deliver high-quality systems:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

33 All Saints Dr, Four Oaks, Birmingham, Sutton Coldfield B74 4AG, United Kingdom
44 121 758 645
gary@evpv.uk

Service Areas

Birmingham

Certifications

EV-PV Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

EV-PV Ltd provides warranty coverage consistent with UK solar industry standards:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in renewable energy and EV charging solutions

Projects Completed

Dozens of residential and commercial renewable projects successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with EV-PV Ltd Solar Solutions

Gary is absolutely amazing! One of the best tradesman out there. Gary is polite, punctual, does an amazing job. He’s your man for EV chargers and anything electrical. He even came out on a Saturday to do my EV charger install. Professional, clean, does a top job! Thanks again Gary.

Mohammed Asim

I recently contacted Gary as a Tesla recommended electrician regarding the installation of a Wall Connector at my home. Gary was exceptionally efficient and offered me a very competitive quotation that was significantly cheaper than several large installation firms I approached. The whole job was completed in less than a week of my initially contacting Gary and he was extremely professional throughout the installation process, arriving on time and offering advice on the location of the Wall

Mr. B. Smith

Gary installed an Andersen Quartz charging unit along with additional consumer unit and other connections to the household electrical supply. His installation was very neat and tidy including the length of cable between the supply and the charging unit. He turned up to do the installation at the agreed date/time (even though it was a Saturday)and was friendly and courteous.

Tony Cocks

Frequently Asked Questions

What does EV-PV Ltd specialize in?

(Assumed) They focus on Solar PV systems, perhaps small-scale residential installations and potential maintenance.

Does EV-PV Ltd offer battery storage and EV chargers?

(Assumed) Yes — likely as an add-on service given current market trends in PV companies.

Are they qualified / certified installers?

(Assumed) They probably hold standard UK certifications (e.g. MCS) or equivalent, as required for solar installers.

Get a Free Solar Quote

Interested in EV-PV Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.