
Energy Concerns Ltd is a UK-based renewable energy specialist, dedicated to providing high-quality solar PV systems and sustainable energy solutions to homes and businesses. With a reputation built on professionalism, expertise, and exceptional customer service, Energy Concerns has become a trusted partner for clients looking to reduce energy costs and carbon footprints.
The company’s mission is to make renewable energy both accessible and affordable, helping customers achieve long-term energy independence while contributing to environmental sustainability. With strong customer reviews and excellent ratings for installation quality, product performance, and aftercare, Energy Concerns has established itself as a leading name in the UK solar industry.
Backed by an experienced team of engineers and consultants, Energy Concerns delivers tailored energy solutions, ensuring each system is designed for maximum efficiency and reliability. From residential rooftops to larger commercial projects, the company offers end-to-end services that cover consultation, design, installation, and ongoing maintenance. Their vision is to support the UK’s transition to clean energy by delivering projects that are both innovative and future-proof.
Energy Concerns Ltd partners with trusted solar and renewable energy technology brands:
EV Charging: Pod Point, Zappi, Rolec



Energy Concerns Ltd operates with or in line with leading industry certifications:
Energy Concerns Ltd provides warranties consistent with UK industry standards:
English
Over a decade of expertise in the renewable energy sector
Hundreds of successful residential and commercial solar projects delivered across the UK
Steve, Lance and Todd did a superb job on my solar panel installation. They installed 34 panels and a Sigenergy inverter and battery storage system. I contacted many companies for quotes, but Energy Concerns were the only ones who came to my property to assess the potential roof space so that they could maximise the system. All the other companies used the same online software and provided quotes remotely, despite asking them to pay a visit due to the non-standard layout and construction of the roofs. As a result, I've ended up with a much better system, and the cost per panel was cheaper than all of the other quotes too.
Todd, Steve & Lance were amazing. From the outset, Todd was very informative and explained the options to suit my requirements. This company uses a flashy software product to provide a very detailed quote, and their system kept me updated with each stage of the process from booking the scaffolding, scheduling the works and even provided the date when the rubbish & waste was collected. The quotation contained mini videos to explain each stage and component, which made it easier to understand.
Energy Concerns fitted solar panels and battery system to our church hall roof. It is a large system (26.4kW panels and 16kWh battery) and was fitted in one week. I'd definitely recommend them.
Energy Concerns has been serving customers for over 30 years, providing expertise in renewable energy and sustainability.
They use high-quality solar PV systems from trusted manufacturers to deliver reliable, long-term performance.
Yes, they assist customers with renewable energy schemes and grants to maximize savings and return on investment.