London

Energian

Energian offers high-powered, efficient solar panels and full solar energy system installations tailored for homes and businesses.
★★★★★  
5
👥
10
Reviews
🏆Elite+ Installer

About

Energian is a UK-based renewable energy solutions provider focused on delivering high-quality solar PV systems, battery storage, and sustainable energy technologies. With a strong emphasis on customer service and innovation, Energian helps households and businesses achieve energy independence, lower bills, and reduce environmental impact.

The company’s mission is to make renewable energy both accessible and reliable, providing end-to-end services that cover system design, installation, and ongoing support. Energian has earned excellent customer ratings for product quality, installation service, and customer care, reflecting its dedication to exceeding expectations.

By working with trusted manufacturers and utilizing cutting-edge technology, Energian ensures that every solar system is optimized for long-term performance and maximum return on investment. Their vision is to accelerate the UK’s renewable energy transition while empowering communities to adopt cleaner, greener energy solutions.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage solutions

✔️ EV charging point installation

✔️ Solar maintenance and servicing

✔️ Energy consultation and audits

✔️ Flexible financing and support options

Products & Manufacturers

Energian works with some of the most reliable renewable energy brands in the UK market:

  • Solar Panels: Q CELLS, Trina Solar, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Weatherill House, Business Centre, 23 Whitestone Way, Croydon CR0 4WD, United Kingdom
442080640335
info@energian.co.uk

Service Areas

London

Certifications

Energian operates with or in line with key UK renewable energy certifications, including:

  • MCS (Microgeneration Certification Scheme) – certified quality installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – fair trading and consumer protection.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Energian provides warranty coverage in line with industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of active operation in the UK renewable energy sector

Projects Completed

Hundreds of residential and commercial projects successfully installed

Customer Reviews

Read what our customers have to say about their experience with Energian Solar Solutions

I ordered an EcoFlow PowerKit battery which was a good price and was delivered really quickly which was a perfect experience. However, I forgot to order the cable and had 1 day until we were going away and needed it! Gene helped me get one sent out that day, at 430pm and it arrived the next morning, just time time for the big trip. I really appreciate the quick email response, helpfulness and willingness to dispatch the order straight away. Really really great service. Also the website is easy to use, products easy to research and prices are good. I highly recommend!

Charlie Mills

EcoFlow RIVER power station is well built and powers my hair drier, tablet and motorhome TV without a problem. Delivery was very quick. Great service from Energian. Thanks!

Sid Waterman

Gene was very professional and helpful. Answered all of my enquiries and resolved all my concerns. Went above and beyond regarding an extensive and detailed enquiry that continued to lead from one question to another. All in all the enquiry session lasted approximately 1 hour and a half or so. With no delay or need for repeating questions etc. Great can do attitude. Especially since Gene stayed with the enquiry and we came to a close nearing to 5pm on a Sunday afternoon great response and form of customer interaction. Keep up the positive work.

Hanna Banayouti

Frequently Asked Questions

How long has Energian been in business?

Energian has been operating in the UK renewable sector for years, offering solar PV, battery storage, and green energy solutions.

What financing options does Energian provide?

They offer flexible financing and payment plans to make solar accessible for all budgets.

How eco-friendly are Energian’s solar solutions?

Their systems help customers lower energy costs while contributing to significant carbon reduction.

Get a Free Solar Quote

Interested in Energian? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.