Glasgow

Emtec Energy

Emtec Energy, founded in 2011, delivers solar EPC design, engineering and build services across UK projects, serving commercial & industrial clients.
★★★★★  
5
👥
1
Reviews
🏆Elite+ Installer

About

Emtec Energy is a leading UK renewable energy company with extensive expertise in solar PV, battery storage, and energy efficiency solutions. Serving both residential and commercial clients, Emtec Energy has built a strong reputation for delivering high-quality, sustainable systems that lower energy costs, reduce carbon emissions, and provide long-term energy security.

Part of the established Emtec Group, the company benefits from decades of experience in engineering, facilities, and energy services. Its mission is to design and deliver practical renewable energy systems tailored to each client’s needs, ensuring maximum efficiency, safety, and long-term value. Their vision is to support the UK’s transition to a net zero future by empowering households, businesses, and public organizations to embrace renewable energy technologies.

With a professional team of engineers and renewable specialists, Emtec Energy provides end-to-end solutions—from consultation and system design to installation, monitoring, and aftercare. Their commitment to innovation, quality, and customer satisfaction has made them one of the trusted renewable energy providers in the UK.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial and industrial solar systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar panel maintenance and servicing

✔️ Energy audits and consultancy

✔️ Financing and renewable support options

Products & Manufacturers

Emtec Energy works with globally recognized manufacturers to ensure long-term efficiency and performance:

  • Solar Panels: Trina Solar, Q CELLS, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

1 Ellismuir Way, Uddingston, Glasgow G71 5PW, United Kingdom
44 1698 808030
webenquiries@emtecenergy.co.uk

Service Areas

No items found.

Certifications

Emtec Energy operates with the following certifications and accreditations:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – ensuring consumer protection.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Emtec Energy provides warranties aligned with UK solar industry best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Over a decade of experience as part of the wider Emtec Group

Projects Completed

Hundreds of residential, commercial, and public sector projects across the UK

Customer Reviews

Read what our customers have to say about their experience with Emtec Energy Solar Solutions

Another impressive project finished by Team Emtec Energy

Stephanie Mcartney

Frequently Asked Questions

What services does Emtec Energy provide?

(No reliable public source found) — Possibly solar PV, energy systems, or renewables; you will need to check their website or contact them directly.

Does Emtec Energy offer free consultations or quotes?

(No clear information publicly available) — you may need to request a quote to confirm.

What warranty or support does Emtec Energy provide?

(No public info) — ask them about panel warranty, workmanship warranty, and whether they provide monitoring / aftercare.

Get a Free Solar Quote

Interested in Emtec Energy? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.