London

Emerald Green Energy Ltd

Emerald Green Energy Ltd manufactures high-efficiency solar panels and complete solar power systems, supplying a variety of renewable energy products globally since 2004.
★★★★★  
5
👥
53
Reviews
🏆Elite+ Installer

About

Emerald Green Energy Ltd is a UK-based renewable energy provider specializing in solar PV installations, battery storage, and sustainable energy technologies for both residential and commercial clients. With a commitment to delivering high-quality and cost-effective energy solutions, the company empowers customers to lower their energy bills, reduce carbon emissions, and move toward energy independence.

Emerald Green Energy Ltd’s mission is to make renewable energy simple, affordable, and practical for every customer. Their skilled team of engineers and renewable specialists design and install bespoke solar systems tailored to individual requirements, ensuring maximum efficiency and long-term reliability.

The company’s vision is to support the UK’s transition to net zero by helping households, businesses, and communities adopt clean energy technologies. Through a customer-first approach and a dedication to sustainability, Emerald Green Energy Ltd has built a strong reputation for professionalism, technical expertise, and reliable aftercare services.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar systems

✔️ Battery storage integration

✔️ EV charging point installation

✔️ Solar panel maintenance and servicing

✔️ Energy audits and consultation

✔️ Flexible financing and renewable support

Products & Manufacturers

Emerald Green Energy Ltd works with globally trusted manufacturers to ensure performance and reliability:

  • Solar Panels: Trina Solar, Q CELLS, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

1st Floor, One, Cranmore Dr, Shirley, Solihull B90 4RZ, United Kingdom
448009991590
info@e-green.co.uk

Service Areas

London

Certifications

Emerald Green Energy Ltd operates with or in line with recognized UK solar certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – electrical safety and compliance.
  • RECC (Renewable Energy Consumer Code) – ensuring consumer protection.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Emerald Green Energy Ltd provides warranties consistent with UK solar best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on product.

Company Details

Languages Spoken

English

Years in Business

Several years of operation in the UK renewable energy sector

Projects Completed

Dozens of residential and commercial installations successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Emerald Green Energy Ltd Solar Solutions

Absolutely stunned with the work carried out by the full team. Really good communication and as per regulations. No short cuts and even when I was happy, if they was not, they completed the work to full perfection. They also cleaned up everyday and the site was always clean and considerate with neighbours and public. I would highly recommend if you want a hassle free and simple process along with professional workmanship. Thank you all for all your hard work. Happy with the full worked carried out and not a single complaint. I tried hard to pick one but very, very, very impressed.

D R

My friend who does not have a google account wanted to leave a review. My friend had his new boiler fitted by Ibrar and his team from Birmingham today. They worked very efficiently and my friend was very impressed and thanks them for their focused and time efficient service. My friend would definitely recommend them to others.

Yvonne Coulson

Naf's team from bham came, with Ahmed leading the team. They came early morning and just worked tirelessly throughout the day. By around 5pm, they completed the whole new boiler installation! The work was bang on and moreover, their attitude to work and myself was very refreshing. This company has great employees and was great to work with.

Ausaf Khan

Frequently Asked Questions

Is Sunshinen Co. a legitimate solar installer?

Yes, Sunshinen Co. is a trusted renewable energy company offering solar PV and clean energy solutions in the UK.

What areas does Sunshinen Co. serve?

They deliver services across London and surrounding regions for residential and commercial properties.

What warranties does Sunshinen Co. provide on panels and installation?

They provide strong manufacturer warranties on solar panels and workmanship guarantees for reliable results.

Get a Free Solar Quote

Interested in Emerald Green Energy Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.