
Elite Services Group Ltd is a UK-based company providing professional electrical, solar PV, and renewable energy solutions for residential, commercial, and industrial clients. With a strong foundation in electrical contracting and a growing focus on renewable energy, the company is committed to helping clients reduce energy costs, improve efficiency, and transition to sustainable power solutions.
The mission of Elite Services Group Ltd is to deliver reliable, high-quality, and cost-effective energy services that combine technical expertise with a customer-first approach. Their vision is to empower homes and businesses across the UK to adopt solar and renewable energy technologies that support long-term energy independence and align with the UK’s net zero goals.
From consultation and system design to installation and maintenance, the company provides complete end-to-end solutions. With a skilled team of engineers and specialists, Elite Services Group Ltd ensures every project is carried out to the highest standards of safety, efficiency, and performance.
Elite Services Group Ltd partners with trusted renewable brands to ensure system reliability and efficiency:



Elite Services Group Ltd operates with or in line with the following certifications:
Elite Services Group Ltd provides warranty coverage in line with UK solar industry practices:
English
Several years of expertise in electrical and renewable energy solutions
Dozens of residential and commercial projects successfully delivered across the UK
Elite have just finished the installation of an ASHP at my house. The whole process from initial contact, sales visit, heat loss report and systems design, installation and commissioning has been really excellent. Elite have kept me informed throughout and communicated effectively.The installation took 2 days with a team of 4 all of whom worked well together and were clearly expert in their particular discipline. They obviously wanted to do a quality job and they did.Commissioning was done after the system has settled for a day. James Clark did this work and the attention to detail was amazing. James went through the system with me and explained the controls and how to get the best from them.
I've waited six months to review my installation, and it's time to share my experience, elite installed myenergi 15kw Batteries and Solar pannels. And from start to finish ever member from office staff to engineers were professional courteous and tidy.Even more impressive, my partner was initially against having Batteries and Solar, but we've seen our energy bills decrease dramatically. We've since added an electric car(EV) and a heat pump, and the system continues to perform exceptionally well.
We had our whole heat pump journey from heat loss survey to installation and removal of the gas boiler managed by Elite Services.Can't recommend the company highly enough. The design was spot on - the whole house is now lovely and warm. We previously had 2 cold rooms (upstairs bathroom and living room) with our original combi boiler, and now they are finally warm for the first time.
Elite Services Group operates in Yorkshire and Lincolnshire, offering solar PV, battery storage, EV charging, and heating installations.
Yes — they promote a “free estimate / no-obligation online estimate” for solar panel installations.
Their site claims installations are “carried out by fully accredited solar installers and to the highest of standards,” but I could not locate a precise warranty period. You should ask them for their workmanship and panel warranties.