London

Elite Energy Solutions

Elite Energy Solutions offers a range of solar panels including fixed and portable models, plus battery storage and accessories, promoting clean, cost-effective power solutions.
★★★★★  
5
👥
13
Reviews
🏆Elite+ Installer

About

Elite Energy Solutions is a UK-based renewable energy company specializing in solar PV system design, installation, and maintenance for both residential and commercial clients. The company is committed to delivering clean energy solutions that reduce carbon emissions and energy costs, while ensuring quality and compliance. With a focus on innovation, Elite Energy Solutions aims to make solar technology accessible to more people, by combining modern solar infrastructure with responsive customer support.

Their mission emphasizes reliability, sustainability, and excellent customer service. Elite Energy Solutions works closely with clients from initial consultation through to installation and ongoing aftercare, ensuring that every system is optimized for performance, durability, and safety. Through careful design, high-quality components, and rigorous workmanship standards, they strive to ensure that customers receive long-term value and contribute towards the UK’s transition to renewable energy.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar system installations

✔️ Battery storage solutions

✔️ EV charging infrastructure installation

✔️ Solar maintenance and repair services

✔️ Energy audits and consultancy

✔️ Financing and incentive guidance

Products & Manufacturers

Elite Energy Solutions works with reliable and well-known manufacturers in the UK solar market, including:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Elite Energy Solutions, Jewel House, Unit G Tenlons Rd, Nuneaton CV10 7HW, United Kingdom
442477752754
info@eliteenergysolutions.co.uk

Service Areas

London

Certifications

Elite Energy Solutions is expected to operate in line with, or hold, key UK solar and electrical industry certifications such as:

  • MCS (Microgeneration Certification Scheme) – guaranteeing product & installation standards.
  • NICEIC – for electrical safety and compliance.
  • RECC (Renewable Energy Consumer Code) – ensuring fair practices and consumer protection.
  • ISO 9001 / ISO 14001 – quality management and environmental systems (if applicable).

Warranty Information

Elite Energy Solutions offers warranties aligned with UK industry norms:

  • Solar panels – 20-25 years performance warranty.
  • Inverters – 5-12 years manufacturer’s warranty.
  • Workmanship / installation – typically 5-10 years.
  • Battery storage systems (if applicable) – 5-10 years depending on the brand.

Company Details

Languages Spoken

English

Years in Business

Several years in the UK renewable energy sector

Projects Completed

Hundreds of solar and energy efficiency installations successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Elite Energy Solutions Solar Solutions

We recently used Elite Energy solutions to supply and fit an EV charger. Adam was our point of contact and his knowledge of EV chargers is second to none. His advice was spot on and we're happy with his recommendation. The guys that came out to fit the charger were polite and efficient and incredibly neat and tidy. They helped me set up the app and showed me how it worked before leaving. Adam followed up with a courtesy call and messages to ensure I was happy with the work done. I can confidently recommend this company and would use them again in the future.

kelly lickorish

In-line with our commitment to reach net-zero by 2030 we wanted to add battery storage to our existing solar PV solution. We received professional advice from Adam with no pressure to buy. This, combined with with top quality support throughout makes for a company whom we will highly reccommend to other businesses.

Richard Morgan

Contacted Adam for a solution for my daughter’s bedroom as always cold. He recommended two heaters we went for the Smart WiFi glass space heater. It was very well priced and Adam delivered it very quick. Highly recommended to all. Great heater very easy to use.

Michaela Wheeler

Frequently Asked Questions

How long has Energian been in business?

Energian has been serving the UK renewable energy market for several years, delivering solar, battery storage, and sustainable solutions.

What financing options does Energian provide?

They provide tailored finance options to make solar energy affordable for homeowners and businesses.

How eco-friendly are Energian’s solar solutions?

Their installations reduce reliance on fossil fuels and contribute to the UK’s carbon reduction targets.

Get a Free Solar Quote

Interested in Elite Energy Solutions? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.