
Eco-Wright Energy is a UK-based renewable energy company specializing in solar PV installations, battery storage, and sustainable energy solutions. Known for its commitment to innovation, quality, and customer satisfaction, the company provides tailored renewable systems that help households and businesses cut energy costs and reduce carbon footprints.
Eco-Wright Energy’s mission is to make clean energy practical and affordable while ensuring long-term efficiency and reliability. Their team of skilled engineers and renewable energy experts deliver bespoke solar PV systems designed to suit each client’s energy needs, property type, and budget. With a focus on transparency, safety, and technical excellence, Eco-Wright Energy ensures every project is installed to the highest standards.
The company provides end-to-end services, from consultation and design through to installation and ongoing maintenance. Their vision is to support the UK’s clean energy transition by enabling more communities and businesses to access renewable power and achieve energy independence.
Eco-Wright Energy works with trusted manufacturers in the UK renewable energy market:



Eco-Wright Energy operates with or in line with the following certifications:
Eco-Wright Energy provides warranty coverage consistent with industry standards:
English
Several years of operation in the renewable energy sector
Dozens of residential and commercial installations successfully delivered across the UK
Big thanks to James and Anna for installation of underfloor heating and replacing the gas boiler. Heating system works well, communication (including after installation) has been excellent. They clearly understand heat pumps. Importantly there have been no surprises regarding costs and they worked as far as possible to minimise disruption.
Eco-Wright Energy installed the air source heat pump in the new build property we purchased in 2022. We’re very pleased with the system which Eco-Wright Energy service for us every year. Anna and James are always easy to deal with, reliable and happy to help us use the system efficiently.
Ours is a fairly ordinary 1980s house with adequate but hardly exceptional levels of insulation. James and Anna designed the heating system after their heat loss assessment and installed a Samsung heat pump, under floor heating, some replacement radiators and a water cylinder. The performance has been really effective and the house is warmer than when using the gas boiler. Running costs are similar to the old setup.
Knight & Day Solar is an established London-based company with years of experience in solar panel installations.
They install high-quality, efficient solar panels from trusted brands to ensure durability and performance.
Yes, they provide complete renewable packages, including battery storage systems and EV charging solutions.