Leicester

Eco Power Systems Ltd

Eco Power Systems Ltd designs and installs solar & energy-efficient systems, enabling customers to shift toward sustainable, cost-smart power.
★★★★★  
5
👥
5
Reviews
🏆Elite+ Installer

About

Eco Power Systems Ltd is a UK-based renewable energy company specializing in solar PV, battery storage, and sustainable energy solutions for residential, commercial, and industrial clients. With a reputation for quality installations and reliable service, the company helps customers lower their energy costs, reduce carbon emissions, and achieve greater energy independence.

The mission of Eco Power Systems Ltd is to make renewable energy accessible, affordable, and practical while delivering tailored solutions that meet the specific needs of each client. Their vision is to support the UK’s net zero future by integrating advanced solar and storage technologies into homes and businesses across the country.

From initial consultation and system design through to installation and aftercare, Eco Power Systems Ltd provides a complete, customer-focused service. With years of expertise and a professional team of engineers, the company has established itself as a trusted partner in delivering energy-efficient, future-proof solutions.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar systems

✔️ Industrial-scale solar energy solutions

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar panel maintenance and servicing

✔️ Energy efficiency consultation

✔️ Financing and renewable support options

Products & Manufacturers

Eco Power Systems Ltd works with trusted renewable manufacturers to ensure system performance and longevity:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

The courtyard, fields farm business centre, Sapcote, United Kingdom
44 1455 370555
Info@ecopowersystems.co.uk

Service Areas

Leicester

Certifications

Eco Power Systems Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified renewable installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical trading.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Eco Power Systems Ltd provides warranties aligned with UK solar industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of expertise in renewable energy and sustainable power solutions

Projects Completed

Dozens of residential, commercial, and industrial projects successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Eco Power Systems Ltd Solar Solutions

Outstanding solar panel installation by Eco Power Systems Ltd. From the initial consultation to the final installation, the team was professional, knowledgeable, and very helpful. They provided me with expert guidance to choose the best system for my home. The installation team arrived on time and worked very efficiently,

Judith Montgomery

From the initial consultation to the installation and beyond, Eco Power Systems have been thoroughly professional and informative. The system was planned according to our needs. The work was completed on time and went live the same day. They have provided ongoing support and we would have no hesitation in recommending them to any future customers. Excellent service.

C S

The Team at Eco Power Systems did a fantastic job at my house installing a ground mounted Fox system capable of 30 Kw and a 66 Kwh battery system. Worked with me all the way through the project to make sure the system delivered my requirements and great after care service when one of the batteries failed. Cannot fault David, Anthony and the team

Nick Hayter

Frequently Asked Questions

What areas does Eco Power Systems Ltd serve?

Eco Power Systems is based in Leicestershire and offers nationwide service.

What certifications should Eco Power Systems hold?

They are NICEIC / MCS approved, and are members of the Renewable Energy Consumer Code (RECC).

Does Eco Power Systems offer battery storage or EV charging solutions?

Yes — they specialize in both solar PV and battery storage systems (turnkey).

Get a Free Solar Quote

Interested in Eco Power Systems Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.