Leicester

Cuberoot Energy Ltd

Cuberoot Energy Ltd installs solar PV systems across the UK, combining design, installation & support to drive sustainable energy adoption.
★★★★★  
5
👥
1
Reviews
🏆Elite+ Installer

About

Cuberoot Energy Ltd is a UK-based renewable energy company specializing in solar PV installations, battery storage, and sustainable energy solutions for homes, businesses, and public sector organizations. With a focus on innovation and customer satisfaction, the company delivers bespoke renewable systems designed to reduce energy bills, increase energy independence, and contribute to a low-carbon future.

The mission of Cuberoot Energy Ltd is to make renewable energy simple, reliable, and cost-effective, ensuring customers benefit from long-term energy savings and environmental impact reduction. Their vision is to play a vital role in the UK’s clean energy transition by enabling more households and organizations to adopt renewable technologies.

Known for professionalism, transparent pricing, and strong aftercare, Cuberoot Energy Ltd provides end-to-end services including consultation, system design, installation, and ongoing maintenance. With a skilled team of renewable energy specialists and a commitment to excellence, the company has built a reputation as a trusted partner in the renewable sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar system servicing and maintenance

✔️ Energy consultation and audits

✔️ Financing and renewable support

Products & Manufacturers

Cuberoot Energy Ltd works with globally trusted renewable energy manufacturers to ensure quality and performance:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

82 Broad St, Syston, Leicester LE7 1GH, United Kingdom
44 116 260 3545
bob@cuberoot-energy.co.uk

Service Areas

Leicester

Certifications

Cuberoot Energy Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – fair consumer practices and protection.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Cuberoot Energy Ltd offers warranty coverage aligned with UK solar industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of expertise in renewable energy installations

Projects Completed

Dozens of residential and commercial projects successfully completed across the UK

Customer Reviews

Read what our customers have to say about their experience with Cuberoot Energy Ltd Solar Solutions

Absolutely delighted with my Solar PV and battery installation from Cuberoot Energy. They have been highly professional throughout the whole process, the final cost was the same as their initial quote, and they even explained the workings of the system in laymans terms, not scientific jargon. The actual products specified are of a very high quality and installed very accurately. The solar PV panels are very unobtrusive in particular. Overall a very positive experience and I am now producing and exporting my own solar energy.

Simon Lewis

Frequently Asked Questions

What panel and inverter brands does Cuberoot Energy use?

Cuberoot sources panels from manufacturers such as Hanwha Q Cells, SunPower, Mitsubishi, Panasonic, and inverters from SMA, SolarEdge, Tesla, GivEnergy.

What areas does Cuberoot Energy serve?

They serve the UK (across England & Wales) from their base in Leicestershire.

Is Cuberoot Energy accredited under consumer protection / renewable energy codes?

Yes — Cuberoot Energy is a member of the Renewable Energy Consumer Code (RECC).

Get a Free Solar Quote

Interested in Cuberoot Energy Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.