Hull

Crafted Electrics Ltd

Crafted Electrics Ltd offers tailored electrical and solar installations, focusing on high standards, safety, and client satisfaction.
★★★★★  
5
👥
10
Reviews
🏆Elite+ Installer

About

Crafted Electrics Ltd is a UK-based electrical and renewable energy specialist providing solar PV installations, battery storage solutions, and EV charging services. With a strong foundation in electrical engineering, the company combines technical expertise with a commitment to sustainability, helping households and businesses reduce energy bills and carbon emissions.

The mission of Crafted Electrics Ltd is to deliver safe, efficient, and future-ready energy systems that meet the highest industry standards. Their vision is to support the UK’s transition to clean energy by offering tailored renewable solutions that empower clients to achieve long-term energy independence.

With a customer-first approach, Crafted Electrics Ltd provides end-to-end services including consultation, system design, installation, and aftercare. Known for professionalism, attention to detail, and high-quality workmanship, the company has earned a reputation as a reliable partner for both residential and commercial clients.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Full electrical contracting services

✔️ Solar panel servicing and maintenance

✔️ Energy audits and consultation

Products & Manufacturers

Crafted Electrics Ltd partners with leading global renewable brands to ensure efficiency and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

38 The Orchard, Leven, Hull, Beverley HU17 5QA, United Kingdom
44 1482 455186
craftedelectrics@gmail.com

Service Areas

Hull (Kingston upon Hull)

Certifications

Crafted Electrics Ltd operates with or in line with recognized UK certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – ensuring compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer rights and fair practices.
  • ISO 9001/14001 – quality and environmental management standards.

Warranty Information

Crafted Electrics Ltd provides warranties aligned with solar industry practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of expertise in electrical and renewable energy services

Projects Completed

Dozens of residential and commercial solar and electrical projects delivered successfully

Customer Reviews

Read what our customers have to say about their experience with Crafted Electrics Ltd Solar Solutions

We recently had a full solar PV system installed by Corey & Jake, on a Victorian terraced House, on our South & West facing roofs, I have to say that Corey was excellent throughout the entire process, Regarding what would work best for us, and was more than willing to listen to our needs, and came out to site survey before we committed We opted to go with theSigenergy setup of 16 panels @ 7.2kw. over 2 roofs, a 6kw invertor and 16kw of battery storage, On the day of install the arrived on time and were very polite and respectful , whilst keeping us in the loop with what they were doing,

ian butters

We’ve used Crafted Electrics for all our shop fitting and commercial electrical work, and they’ve consistently delivered top-quality results. Their professionalism, reliability, and attention to detail are second to none. I was so impressed with their work that I even had them rewire my own home — and they did a fantastic job. Highly recommended!

Luke Sundborg

We recently had solar panels fitted and Corey and his team went above and beyond, we’ve used Corey in the past for other electrical issues and really cannot speak highly enough of him and the work he has done, I will always recommend him to others looking for an electrician.

Bethany Clark

Frequently Asked Questions

What areas does Crafted Electrics serve?

They serve Hull and East Riding of Yorkshire (including Hull, Bridlington, Beverley, Goole, Driffield) for solar installations.

What renewable services does Crafted Electrics provide?

They specialize in residential & commercial solar panel installations and EV charger installation.

Do they offer maintenance and monitoring services?

Yes — they offer ongoing monitoring and maintenance to ensure long-term performance.

Get a Free Solar Quote

Interested in Crafted Electrics Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.