Cardiff

Complete Solar Services

Complete Solar Services handles solar PV installations, maintenance & support for residential and commercial clients, delivering reliable green energy.
★★★★★  
5
👥
38
Reviews
🏆Elite+ Installer

About

Complete Solar Services is a UK-based renewable energy company providing high-quality solar PV installations, battery storage, and energy efficiency solutions for both residential and commercial clients. With a commitment to professionalism, transparency, and customer satisfaction, the company has earned a reputation as a trusted name in the renewable energy sector.

The mission of Complete Solar Services is to deliver tailored clean energy systems that reduce electricity costs, improve energy independence, and support the UK’s net zero goals. Their vision is to empower households and businesses to embrace renewable technologies through affordable, efficient, and future-ready solutions.

Offering end-to-end services, the company manages every stage of the process, from initial consultation and bespoke design to installation and aftercare support. Backed by a team of experienced engineers and renewable energy specialists, Complete Solar Services ensures every project is delivered to the highest safety and performance standards.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar system maintenance and repairs

✔️ Energy audits and consultation

✔️ Flexible financing and renewable support

Products & Manufacturers

Complete Solar Services works with leading renewable technology providers to ensure performance and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Cardiff, United Kingdom
44 800 054 1889
garethrdwilliams@googlemail.com

Service Areas

Cardiff

Certifications

Complete Solar Services operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Complete Solar Services provides warranties aligned with UK solar industry standards:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy experience in the UK

Projects Completed

Dozens of residential and commercial projects successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Complete Solar Services Solar Solutions

Well, it was a job well done. I had a few quotes, but most of it was virtual. Sam was the one person who came and meet me face to face for a survey and on the spot price. Communication with Sam was great and quick. He is also very competitive. Sam will try to match and beat any price. Within 3 weeks from my fist contract with Sam the job was completed. I would definitely recommend anyone to use compete solar services for solar installations. Keep up the good work Sam. 👍

Ashvin Seeruthun

Very happy with the work carried out by CSS. Thank you for sorting everything and all the Advice along the way. 👌👍 hopefully be in touch soon for some more work!

Paul Cartwright

Excellent company from start to finish no hard sell professional all paperwork carried out for Solar install all on time Sam and Ben great to work with , would recommend them to anybody

Johann Gilardi

Frequently Asked Questions

What kinds of projects does Complete Solar Services handle?

They handle full-service solar installations including design, installation, maintenance, and support.

Do they provide tailored solutions or standard packages?

They emphasize bespoke solutions tailored to each client’s needs rather than one-size-fits-all.

How long has Complete Solar Services been established?

Complete Solar Services Ltd was incorporated on 6 June 2023.

Get a Free Solar Quote

Interested in Complete Solar Services? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.