Leicester

C Gascoigne Ltd

C Gascoigne Ltd offers electrical contracting, project management and technical services across infrastructure and renewable energy projects.
★★★★★  
5
👥
80
Reviews
🏆Elite+ Installer

About

C Gascoigne Ltd is a UK-based renewable energy and electrical contracting company, providing solar PV systems, battery storage, and comprehensive electrical services for residential and commercial clients. With years of experience in the energy and electrical sectors, the company has earned a reputation for reliability, technical expertise, and customer-focused solutions.

The mission of C Gascoigne Ltd is to deliver safe, efficient, and cost-effective renewable energy systems that help clients lower energy costs, achieve energy independence, and reduce carbon emissions. Their vision is to play an integral role in the UK’s renewable energy transition by offering tailored, future-ready solutions that align with the country’s net zero targets.

C Gascoigne Ltd offers a complete end-to-end service, from initial consultation and bespoke design through to installation and aftercare. Known for its professionalism, transparency, and dependable customer service, the company continues to build trust among homeowners and businesses alike.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Full electrical contracting services

✔️ Solar system servicing and maintenance

✔️ Energy consultation and audits

Products & Manufacturers

C Gascoigne Ltd partners with trusted global renewable brands to ensure efficiency and durability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

56 Pitsford Dr, Loughborough LE11 4NY, United Kingdom
44 1509 341971
info@cgascoigne.co.uk

Service Areas

Leicester

Certifications

C Gascoigne Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – ensuring compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and fair practices.
  • ISO 9001/14001 – quality and environmental management standards.

Warranty Information

C Gascoigne Ltd offers warranties consistent with UK solar industry best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in electrical and renewable energy services

Projects Completed

Dozens of residential and commercial solar installations across the UK

Customer Reviews

Read what our customers have to say about their experience with C Gascoigne Ltd Solar Solutions

After 14 years our solar panels inverter was playing up. We found this company who were able able to help and they did an excellent job. Bev provided a number of quotes and answered all our questions and Craig came and carried-out the replacement. A very professional company, very pleasant and straight forward to deal with. Highly recommend.

Judith Kerridge

Had a replacement inverter fitted for our solar panels. Very professional company, good at communication, kept us updated every step of the way. Craig was very professional, knowledgeable and efficient at the job. Bev is lovely, very helpful and friendly

Tracey Fuller

Great company. Helpful from the get go. Initially contacted for help with an inverter and they were happy to discuss with no pressure to sell. When it became clear I needed a new inverter they provided Impartial advice on a number of options. Once I had decided in which inverter a convenient day was agreed and Craig arrived at the agreed time and soon had me up an running again. Both Craig and Bev were excellent through out the process. Would highly recommend this company for all things solar from advice to fitting.

Graham Hutton

Frequently Asked Questions

What areas does C Gascoigne Ltd serve?

(No explicit area info found) — likely local or regional within the UK. You may need to check their “Contact” or “Services” page for service area details.

What certifications should C Gascoigne Ltd have?

They should ideally have MCS (Microgeneration Certification Scheme) accreditation, RECC membership, or equivalent UK solar certifications.

Does C Gascoigne Ltd offer free quotes or consultations?

(No publicly listed confirmation) — many solar firms do; contact them to ask whether they provide a no-obligation site survey.

Get a Free Solar Quote

Interested in C Gascoigne Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.