London

British Solar Power

British Solar Power develops, builds, and manages large-scale solar and storage projects, advancing clean power and sustainable energy across the UK and beyond.
★★★★★  
5
👥
3
Reviews
🏆Elite+ Installer

About

British Solar Power is a UK-based renewable energy company specializing in the design, installation, and maintenance of solar PV systems for residential, commercial, and industrial clients. With a focus on quality, innovation, and sustainability, the company provides tailored energy solutions that reduce electricity bills and help customers transition toward a greener lifestyle.

Built on a foundation of expertise and customer trust, British Solar Power has earned recognition for delivering reliable solar solutions backed by excellent service and strong industry knowledge. Their mission is to make solar power accessible, cost-effective, and environmentally responsible, while their vision is to contribute to the UK’s renewable energy transition and global net zero goals.

British Solar Power’s skilled team offers end-to-end project delivery, from consultation and system design to installation and aftercare. With high ratings for service quality and certifications that demonstrate compliance with industry standards, the company is positioned as a trusted partner for sustainable energy solutions across London and the wider UK market.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Industrial-scale solar projects

✔️ Battery storage system integration

✔️ EV charging infrastructure installation

✔️ Solar system maintenance and repairs

✔️ Energy efficiency consultation and audits

Products & Manufacturers

British Solar Power partners with leading global manufacturers to deliver efficient and reliable renewable energy solutions:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

43 Berkeley Square, London W1J 5AP, United Kingdom
442032912821
info@britishrenewables.com

Service Areas

London

Certifications

British Solar Power holds or operates in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – ensuring solar PV installation quality.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer rights and ethical trading.
  • ISO 9001/14001 – quality management and environmental responsibility.

Warranty Information

British Solar Power provides warranties consistent with UK solar industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Over a decade of experience in renewable energy solutions

Projects Completed

Hundreds of residential, commercial, and industrial solar projects across the UK

Customer Reviews

Read what our customers have to say about their experience with British Solar Power Solar Solutions

I initially found Britsolar and Rob through the MCS helpdesk and he changed a faulty gen meter for me. I realised then he was an honest and competent man, with huge amounts of experience so he was top of the list when I came to buy an installation on my new house this year. I got 5kW of PV and a 7kWh battery by Lux Power fitted expertly in a day and at great value by Rob's installers. Would highly recommend!

John Whybrow

Rob's team removed and refitted our solar panels onto extension roof with new inverter at short notice and fair price. Rob came back after a few weeks and painstakingly tested everything over 2 days to diagnose and fix voltage drop caused by corroded internal connectors not visible previously. Very knowledgeable and trustworthy. Would highly recommend.

Kerry Patel

We have recently had installed 16 solar panels, a Solax hybrid inverter and a Solax gen. 4.5 battery by British Solar Ltd. We are very satisfied with the installers with helpful explanations and continuing support. There were delays with some of the components which were not in British Solar Ltd’s control.

val simmonds

Frequently Asked Questions

Is British Solar Power a legitimate solar installer?

Yes, British Solar Power is a trusted UK-based solar installer with expertise in residential and commercial solar systems.

What areas does British Solar Power serve?

They provide services across the UK, helping customers transition to renewable energy with high-quality solar solutions.

How eco-friendly are British Solar Power’s solar solutions?

Their systems are designed to lower electricity bills while significantly reducing carbon emissions.

Get a Free Solar Quote

Interested in British Solar Power? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.