
Bright Solar is a UK-based renewable energy company specializing in the design and installation of solar PV systems, battery storage, and EV charging solutions. With a focus on quality, affordability, and customer care, the company helps households and businesses transition to clean energy, reduce energy bills, and lower their environmental impact.
The mission of Bright Solar is to provide practical, future-ready renewable energy solutions that are tailored to the needs of every client. Their vision is to contribute to the UK’s net zero targets by making solar energy more accessible and supporting the widespread adoption of sustainable technologies.
Bright Solar offers end-to-end renewable energy services including consultation, bespoke system design, installation, and ongoing maintenance. Known for professionalism, reliability, and transparent service, the company has established itself as a trusted partner in the UK solar industry.
Bright Solar works with globally trusted renewable technology brands to ensure efficiency and reliability:
Bright Solar operates with or in line with the following certifications:
Bright Solar provides warranties consistent with UK solar industry best practices:
English
Several years of renewable energy industry experience
Dozens of residential and commercial solar projects successfully delivered across the UK
We are really pleased with our in-roof system. It is barely visible but does the job well. The app is easy to use. The winner for me is the great after sales support. Could highly recommend the company.
I had my solar system installed by Adam and the Bright Solar team at the beginning of this summer and have been delighted with the savings achieved so far on my electricity bills. The service we received from start to finish was first class. I would highly recommend Bright Solar company.
Adam and his team at Bright Solar provided an excellent experience from start to finish. Adam was professional in explaining the whole process and clear about the benefits of solar panels before the installation. The installation went smoothly on the day and they also provided useful aftercare and support to ensure everything is working the way it should. Definitely recommend.
(No definitive public coverage found) — likely they serve local/regional areas in the UK. You would need to check their website or contact them for their service region.
(No clear public info found) — most solar installers offer free consultations / site surveys; check with them directly.
(Not found publicly) — typical warranties in the UK include manufacturer’s panel warranty (10-25 years) plus workmanship warranties; you should request their written warranty terms.