Nottingham

B&R Solar Services Ltd

B&R Solar Services offers solar panel installation, repair and maintenance services with a focus on efficiency, longevity and client satisfaction.
★★★★★  
5
👥
76
Reviews
🏆Elite+ Installer

About

B&R Solar Services Ltd is a UK-based renewable energy company providing expert solar PV installations, battery storage systems, and energy efficiency solutions for both residential and commercial clients. With a reputation for professionalism and high-quality service, the company helps customers lower their energy bills, achieve greater energy independence, and reduce carbon emissions.

The mission of B&R Solar Services Ltd is to make renewable energy accessible and affordable by offering tailored solutions that meet the unique needs of each client. Their vision is to play a key role in the UK’s clean energy transition by empowering households and businesses to adopt sustainable technologies that deliver long-term value.

From consultation and bespoke design to installation and ongoing maintenance, B&R Solar Services Ltd provides end-to-end services carried out by a team of skilled engineers. Known for their customer-focused approach and technical expertise, the company ensures every project is delivered to the highest standards of safety, reliability, and efficiency.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar energy systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar system maintenance and repairs

✔️ Energy audits and consultation

✔️ Financing and renewable support options

Products & Manufacturers

B&R Solar Services Ltd partners with leading renewable energy brands to ensure performance and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

8, Old House Gardens, Edwinstowe, Mansfield NG219TE, United Kingdom
44 1623 707606
Info@solarmansfield.co.uk

Service Areas

Nottingham

Certifications

B&R Solar Services Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – electrical safety compliance.
  • RECC (Renewable Energy Consumer Code) – consumer protection and fair practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

B&R Solar Services Ltd provides warranty coverage aligned with UK solar industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in the renewable energy and electrical sector

Projects Completed

Dozens of residential and commercial solar projects successfully delivered

Customer Reviews

Read what our customers have to say about their experience with B&R Solar Services Ltd Solar Solutions

After moving into an 80yo bungalow we found our electrics needed some serious attention. The lads at B&R Solar sorted us out in no time. Upgrading the consumer unit, adding in extra sockets, running power for an electric shower, upgraded lighting circuits and certification on everything we're now on the right track to get everything updated. Very reasonably priced and hard workers. It's a great team and I'll use them again and again.

Adam Hibbert

James was very comprehensive when exploring the equipment options before the works. We shopped around and found that the kit and installation price quoted by BR Solar was very reasonable for the kit we selected. During the installation they were very professional and thorough, even going out of their way of replacing any broken tiles on our roof before installing the panels on top of it. Overall very satisfied.

Kristaps Ermanis

I contact James at B&R solar services as we had solar fitted 10 years ago and didn't realise how it worked in respect to receiving payments from the National grid. James was amazing and could not help enough. He serviced the system and contacted the national grid as it was not connected. All i can say is "wow". He went above and beyond and at a very reasonable price. I would highly recommend this company. Faultless throughout the whole process.

Mark Stevenson

Frequently Asked Questions

Does B&R Solar handle installation or subcontract?

Publicly available info (via their parent “Electrical Solutions Mansfield”) suggests they do both in-house work and partner with subcontractors for electrical/solar tasks.

What warranties does B&R Solar provide on panels and installation?

Typically they offer panel manufacturer warranties (10-25 years) plus a workmanship warranty; confirm exact terms with B&R Solar.

Does B&R Solar also offer battery storage or EV charging?

Given trends and their electrical services background, it is likely they provide battery systems and EV charger installations — ask them whether they bundle these services.

Get a Free Solar Quote

Interested in B&R Solar Services Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.