.png)
AW Electrics Solar (Sheffield) Ltd is a renewable energy and electrical services company based in Sheffield, UK, specializing in solar PV installations, battery storage, and EV charging solutions. With a background in professional electrical contracting, the company combines technical expertise with a passion for sustainability to deliver safe, efficient, and cost-effective renewable energy systems for homes and businesses.
The mission of AW Electrics Solar (Sheffield) Ltd is to provide high-quality renewable energy solutions that reduce energy costs, improve efficiency, and contribute to the UK’s carbon reduction goals. Their vision is to empower local communities in Sheffield and beyond to adopt solar energy and achieve energy independence through modern, reliable, and sustainable technologies.
From consultation and system design to installation and maintenance, the company provides complete end-to-end services. Known for their professional approach, customer-first attitude, and transparent service, AW Electrics Solar (Sheffield) Ltd has established itself as a trusted partner for households and organizations looking to embrace renewable energy.
AW Electrics Solar (Sheffield) Ltd works with globally trusted renewable energy manufacturers to ensure long-term performance:



AW Electrics Solar (Sheffield) Ltd operates with or in line with recognized UK industry certifications:
AW Electrics Solar (Sheffield) Ltd provides warranty coverage aligned with UK solar industry best practices:
English
Several years of experience in electrical and renewable energy services
Dozens of residential and commercial solar projects successfully completed across Sheffield and the UK
Enquired about having solar batteries fitted to complement my solar panels which were installed 12 years ago. Adam came out to do a site visit to establish feasibility and the best place to fit them (Our garage which is some 4 metres from the side of our house). The quote with 3 different battery options was with me within the week. I chose a Luxpower ACS 3600 inverter with two 5.1KW Hanchu batteries and I thought the pricing was both competitive and fair. An install date was arranged for 15th April (within 4 weeks of the first visit). The equipment was installed neatly and professionally by the AW
Excellent customer service start to finish. Mike, Adam and Michelle have been quick to respond to queries and been happy to answer all our questions. The solar panel installation was at a good price and the installation process was minimally disruptive. They have also accommodated a few individual requests we had in addition to solar panel installation, e.g. helping rewire some light switches and plugs.
Mike and the whole team were great from start to finish. I didn’t know much about solar so they talked me through it, and did some additional work while the scaffolding was up. 100% recommend on a works and communication perspective and the solar is now making money instead of me spending it on electricity! Great local, reliable business
Yes — AW Electrics is MCS-certified for solar PV installations and also an OLEV-registered installer for EV chargers.
AW Electrics (Sheffield) Ltd was incorporated on 8 April 2011.
They provide solar PV, battery storage, and EV charging systems.