Leicester

Arrowtec Solar & EV

Arrowtec Solar & EV integrates solar, battery and EV charging solutions for homes and businesses, helping clients streamline green energy adoption.
★★★★★  
5
👥
43
Reviews
🏆Elite+ Installer

About

Arrowtec Solar & EV is a UK-based renewable energy company specializing in solar PV systems, battery storage, and electric vehicle (EV) charging solutions. With a strong focus on innovation and sustainability, the company delivers high-quality renewable energy systems designed to reduce energy costs, lower carbon emissions, and provide long-term energy independence for both residential and commercial clients.

The mission of Arrowtec Solar & EV is to make clean energy and EV technology accessible and affordable, helping households and businesses transition to a greener future. Their vision is to support the UK’s net zero goals by integrating advanced solar technology with cutting-edge EV charging infrastructure.

With a team of experienced engineers and renewable energy specialists, Arrowtec Solar & EV provides end-to-end services—from consultation and system design to installation and aftercare. Known for professionalism, customer care, and technical expertise, the company has become a trusted name in the renewable energy sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar servicing and maintenance

✔️ Energy consultation and audits

✔️ Financing and renewable support

Products & Manufacturers

Arrowtec Solar & EV partners with leading renewable and EV brands to ensure efficiency and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec, Wallbox

Project Gallery

Contact Information

Old Farm Ln, Leicester LE9 9PG, United Kingdom
44 116 216 7979
mark.arrowsmith@arrowtec.co.uk

Service Areas

Leicester

Certifications

Arrowtec Solar & EV operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer rights and fair trading.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Arrowtec Solar & EV offers warranties consistent with industry best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.
  • EV chargers – 3–5 years manufacturer’s warranty.

Company Details

Languages Spoken

English

Years in Business

Several years of expertise in solar and EV charging solutions

Projects Completed

Dozens of residential and commercial installations successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with Arrowtec Solar & EV Solar Solutions

We had solar panels, a battery and an EV charger fitted by Mark and team and couldn’t be happier. The experience was great from start to finish, and didn’t seem to get annoyed by my questions! Would highly recommend.

Jonathan Featonby

We’re really pleased with our solar and battery installation. From the very beginning, the team gave great advice during the quotation stage, helping us understand the options and what would work best for our home. The installation itself was quick, tidy, and professionally done. Everything looks great and fits in well with the house. We’ve started seeing savings on our energy bills straight away. Couldn’t be happier with the whole experience – would definitely recommend Arrowtec to anyone thinking about going solar!

James Wills

Speedy installation by a lovely young man. Any teething problems with us navigating and using the app as new users were quickly ironed out with Mark on a video call. All in all very pleased with a neat and tidy installation and great aftercare!

Wendy Morrison

Frequently Asked Questions

What does Arrowtec Solar & EV specialize in?

They specialize in solar installations and EV charging infrastructure (as implied by “Solar & EV”).

Does Arrowtec handle the full installation or subcontract?

Public details are not explicit — you should ask whether they use in-house installers or subcontractors.

What warranty / guarantee is provided by Arrowtec?

I did not find clear warranty documentation publicly — ask for detailed warranty terms before engaging.

Get a Free Solar Quote

Interested in Arrowtec Solar & EV? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.