London

Alta Vision Solar

Alta Vision Solar provides residential and commercial solar panel installations, focusing on high-quality renewable energy systems to reduce energy costs and carbon footprint.
★★★★★  
5
👥
26
Reviews
🏆Elite+ Installer

About

Alta Vision Solar is a professional renewable energy company based in the UK, specializing in solar PV systems for residential, commercial, and industrial clients. Known for its innovative approach and commitment to excellence, the company provides sustainable energy solutions that help customers reduce electricity costs, achieve energy independence, and support the global transition to clean energy.

With strong ratings for customer satisfaction, installation quality, and product performance, Alta Vision Solar has quickly built a reputation as a reliable solar provider. Their mission is to make renewable energy accessible to all by combining cutting-edge technology with tailored project design and installation services.

The company offers end-to-end solutions, from consultation and system design to installation and long-term maintenance. With a highly skilled team of engineers and installers, Alta Vision Solar ensures every project delivers maximum efficiency and long-term value. Their vision is to empower communities and businesses to embrace solar energy, contributing to the UK’s net zero goals and environmental sustainability.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial and industrial solar energy systems

✔️ Battery storage integration

✔️ EV charging infrastructure setup

✔️ Solar system maintenance and repairs

✔️ Energy efficiency and consultation services

✔️ Flexible financing and support options

Products & Manufacturers

Alta Vision Solar partners with reliable and widely used brands in the renewable energy sector:

  • Solar Panels: JA Solar, Q CELLS, Trina Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

11 Park Ln, Hornchurch RM11 1BB, United Kingdom
447587659192
info@altavisionsolar.com

Service Areas

London

Certifications

Alta Vision Solar operates with or in line with the following UK industry certifications:

  • MCS (Microgeneration Certification Scheme) – certified installations.
  • NICEIC – compliance with electrical standards.
  • RECC (Renewable Energy Consumer Code) – consumer rights and protection.

ISO 9001/14001 – quality and environmental management.

Warranty Information

Alta Vision Solar provides warranties aligned with UK solar best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of solar installation and renewable energy experience

Projects Completed

Dozens of residential and commercial projects, with growing installations across the UK

Customer Reviews

Read what our customers have to say about their experience with Alta Vision Solar Solar Solutions

Very impressed with Alta Vision Solar installation, the team were excellent, professional, polite and hardworking from start to finish including post installation activities. All work and equipment used was of top quality. Especial thanks to Erantha who managed the installation very professionally and informative. Reasonable cost compared to other solar installers. Would very much recommend them.

Sanjay Allagh

I recently had a GivEnergy battery installation at my home, and I couldn't be happier with the entire experience. From the moment the team arrived, their professionalism and friendliness shone through. They took the time to explain every step of the process, ensuring I understood how the battery system works and how it would benefit my energy usage. The installation itself was seamless, and the team was incredibly efficient. They answered all my questions with patience and clarity, making me feel confident in the investment I was making. I appreciated their attention to detail and commitment to ensuring everything was set up perfectly.

siva Pillai

Altavision installed Givenergy system in my house. Era were very helpful and knowledgeable. I highly recommended their services!!

EMP Facility Management

Frequently Asked Questions

Is Alta Vision Solar a legitimate solar installer?

Yes, Alta Vision Solar is a UK-based solar installer providing trusted renewable energy solutions for residential and commercial clients.

What types of solar panels does Alta Vision Solar use?

They use high-quality, efficient solar panels and components sourced from leading global manufacturers.

Does Alta Vision Solar also offer battery storage or EV charging?

Yes, they provide full renewable energy packages including solar batteries and EV chargers.

Get a Free Solar Quote

Interested in Alta Vision Solar? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.