London

Alpha Solar Ltd

Alpha Solar Ltd provides premium renewable energy solutions including solar panels, battery storage, heat pumps, and insulation with certified, high-quality installations.
★★★★★  
5
👥
12
Reviews
🏆Elite+ Installer

About

Alpha Solar Ltd is a UK-based solar energy provider dedicated to delivering high-quality renewable energy solutions for both residential and commercial clients. With a strong focus on customer service and sustainable energy systems, Alpha Solar Ltd is committed to helping customers cut energy costs, reduce carbon footprints, and achieve long-term energy independence.

Known for its reliability, professionalism, and innovative approach, Alpha Solar Ltd specializes in designing bespoke solar PV systems tailored to each customer’s needs. Their mission is to make renewable energy affordable and accessible while maintaining a strong commitment to quality and safety standards.

With excellent customer reviews and ratings, the company has built a reputation for outstanding installation services, product quality, and aftercare support. Whether it’s a small residential installation or a large commercial project, Alpha Solar Ltd combines technical expertise with a customer-first approach to provide energy-efficient solutions that contribute to the UK’s clean energy goals.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage solutions

✔️ EV charging point installations

✔️ Solar system maintenance and repairs

✔️ Renewable energy consultation

✔️ Flexible financing options

Products & Manufacturers

Alpha Solar Ltd works with trusted brands in the UK solar market, including:

  • Solar Panels: Q CELLS, Trina Solar, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Boundary House, Cricket Field Rd, Uxbridge UB8 1QG, United Kingdom
442082544004
info@alphasolar.uk

Service Areas

London

Certifications

Alpha Solar Ltd operates with or in line with leading industry standards:

  • MCS (Microgeneration Certification Scheme) – ensures compliance and quality in solar installations.
  • NICEIC – electrical safety certification.
  • RECC (Renewable Energy Consumer Code) – ensuring consumer protection and fair business practices.
  • ISO 9001/14001 – quality and environmental management standards (where applicable).

Warranty Information

Alpha Solar Ltd provides warranties consistent with industry practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

    Company Details

    Languages Spoken

    English

    Years in Business

    Several years of experience in solar energy installations

    Projects Completed

    Dozens of residential and commercial projects, with growing presence across the UK

    Customer Reviews

    Read what our customers have to say about their experience with Alpha Solar Ltd Solar Solutions

    I've been on the lookout for a good Solar company who can provide me with the right capacity, right quality and great price for over 2 years until I met Bobby at Alpha Solar UK. Bobby is very knowledgeable and understands the needs of customers. They delivered excellently - scaffolding and solar installation done on the same day, and scaffolding taking down 3 days later. I fully recommend them. Excellent and neat work.

    Paul Adesanya

    Fitted 1 1/2 years ago and still working perfectly with good output. The installers Mirek and Mario were excellent and took great care to do the neatest possible job.

    Colin Creer

    Bobby at alpha solar was very informative and provided unique solution suitable for my property. Installers who came were also polite and were very efficient. Left the house tidy. Very impressed with the company.

    lawal kunle

    Frequently Asked Questions

    What areas does Alpha Solar Ltd serve?

    Alpha Solar Ltd delivers solar panel installations across London and surrounding regions, serving both residential and commercial clients.

    Does Alpha Solar Ltd help with government incentives or grants?

    Yes, they assist customers in accessing UK renewable energy grants and incentives to maximize returns.

    What maintenance services are included?

    They provide aftercare, monitoring, and servicing to ensure optimal performance of solar systems.

    Get a Free Solar Quote

    Interested in Alpha Solar Ltd? Fill out this form and they'll contact you
    Thank you! Your submission has been received!
    Oops! Something went wrong while submitting the form.